Commissioning
If all the battery packs are installed, follow these steps to put it in
operation.
1. Remove the upper cover board of T-BAT H 5.8;
2. Remove the small cover plate;
3. Rotate the DIP to corresponding number with small tool
accroding to the number of battery pack(s) that has(have) been
installed(please see the configuration on the right);
4. Move the circuit breaker to the ON position;
5. Press the POWER button to turn on the T-BAT system;
6. Put the small cover plate back;
7. Reinstall the upper cover board to T-BAT H 5.8;
8. Power on the Inverter.
X
VI
VIII
IX
Cable size: 10AWG.
ring terminal
1
3
4
5
2
1. Connect the cables.
2. Get the cables through the corrugated pipe.
3. DO REMEMBER TO INSERT THE SERIES-CONNECTED PLUG AT “-” AND “YPLUG” ON THE RIGHT SIDE OF LAST
BATTERY PACK TO MAKE A COMPLETE CIRCUIT.
4. Set the cables into the groove of metal plates and screw them back to the battery pack on both sides.
The terminal point for GND connection is on the side of grooves as shown below:
-
YPLUG
RS485 II
-
YPLUG
RS485 II
CAUTION!
GND is mandatory!
For T-BAT H 5.8:
1. Insert the series-connected plug at “-” and “YPLUG” on the right side of T-BAT H 5.8 to make a complete circuit.
For T-BAT H 5.8 + 1~3 battery packs:
1. Connect “-” on the right side of T-BAT H 5.8/HV11550 to “+” on the left side of the next battery pack.
2. Connect “YPLUG” on the right side of T-BAT H 5.8/HV11550 to “XPLUG” on the left side of the next battery pack.
3. The rest battery packs are connected in the same way.
4. Insert the series-connected plug at “-” and “YPLUG” on the right side of last battery pack to make a complete
circuit.
-
YPLUG
RS485 II
-
YPLUG
RS485 II
Power Cable Connection
Ground Connection
Overall Installation
For T-BAT H 5.8:
1. Insert one end of the CAN communication cable which has no cable nut directly to the BMS port of the Inverter.
2. Insert the other end of the CAN communication cable to the CAN connector. Assemble the cable gland and screw
the cable nut.
For T-BAT H 5.8 + 1~3 battery packs:
1. Connect RS485 II of upper battery on the right side to RS485 I of the follow-up battery pack which is on the left.
Assemble the cable gland and screw the cable nut.
DIP Configuration:
0-
Matching T-BAT H 5.8 (default)
1-
Matching T-BAT H 5.8 + 1*HV11550
2-
Matching T-BAT H 5.8 + 2*HV11550
3-
Matching T-BAT H 5.8 + 3*HV11550
Power Line Connectioin
Communication Cable Connection
1. Connect the the positive cable (+) and negative cable (-) to the corresponding por t as shown in the
following figure.
2. Keep the Inverter off. Connect the other end of charging cables (+,-) to the correct port on the Inverter.
-
+
BAT-
BAT+
CAN
+
-
WiFi
RF
4
8
5
B
M
S
Upgrade
A
C
BAT
DRM
Meter
-
YPLUG
RS485 II
XPLUG
+
RS485
-
YPLUG
RS485 II
-
YPLUG
RS485 II
-
YPLUG
RS485 II
+
XPLUG
RS485 I
NOTE
Each power line has one
terminal block when leaving
the factory, and customers
need to connect the other
end of terminal block by
themselves.
Please refer to 4.5.2
Cable
Connection Steps
of User
Manual on page 20 to get
detailed connection steps
for power line.