background image

Grounding the PV generator. 

Comply with the local requirements for grounding the PV modules 

and the PV generator. SolaX recommends connecting the generator 

frame and other electrically conductive surfaces in a manner which 

ensures continuous conduction and ground these in order to have 

optimal protection of the system and persons.

NOTE

!

2.3  Explanation of Symbols 

 

This section gives an explanation of all the symbols shown on the inverter and

on the type label.

Symbols on the Inverter

Symbol

Explanation

Operating Display

Communication is active.

An error has occurred, please inform your installer immediately.

Symbols on the Type Label

Symbol

Explanation

CE mark.
The inverter complies with the requirements of the applicable CE guildlines.

TUV certified.

RCM remark.

SAA certification.

Beware of hot surface.

The inverter can become hot during operation. Avoid contact 

during operation.
Danger of high voltages.
Danger to life due to high voltages in the inverter!

Danger.
Risk of electric shock!

Observe enclosed documentation.

The inverter can not be disposed of together with the household waste. 
Disposal information can be found in the enclosed documentation.

Don’t work on this inverter until it is isolated from both mains and on-site

PV generation suppliers.
Danger to life due to high voltage.

There is residual voltage in the inverter which needs 45 min to discharge.

•  Wait 45 min before you open the upper lid or the DC lid.

Important Safety Instructions

When using the product, please do remember the below information to avoid
 the fire, lightning or other personal injury:

Ensure input DC voltage ≤Max. DC voltage . Over voltage may cause

permanent damage to inverter or other losses, which will not be

included in warranty! This chapter contains important safety and

operating instructions. Read and keep this Operation Guide for

future reference.

WARNING

!

Authorized service personnel must disconnect both AC and DC

power from the ZDNY Series inverter before attempting any

maintenance or cleaning or working on any circuits connected to

the ZDNY Series inverter.

WARNING

!

•  Read all instructions, cautionary markings on the inverter, and all appropriate

    sections of this manual before using this inverter.
•  Use only attachments recommended or sold by SolaX.

•  Make sure that existing wiring is in good condition and that wire is not undersized. 

    Do not operate the ZDNY Series inverter with damaged or substandard wiring.

•  Do not disassemble the ZDNY Series inverter. It contains no user-serviceable 

    parts. See Warranty for instructions on obtaining service. Attempting to service 

    the ZDNY  Series inverter yourself may result in a risk of electric shock or fire 

   and will void your warranty. 

•  Keep away from flammable, explosive materials to avoid fire disaster.

•  The installation place should be away from humid or corrosive substance.

07

06

                                   2 Safety

2 Safety

Summary of Contents for ZDNY Series

Page 1: ...copyright of this manual belongs to SolaX Power Co Ltd Any corporation or individual should not plagiarize partially copy or fully copy it including software etc and no reproduction or distribution o...

Page 2: ...BASIC FEATURE 3 2 TERMINALS OF PV INVERTER 3 3 DIMENSION 3 4 IDENTIFICATION OF ZDNY 10 10 10 11 11 4 TECHNICAL DATA 4 1 DC INPUT 4 2 AC OUTPUT 4 3 EFFICIENCY SAFETY AND PROTECTION 4 4 GENERAL DATA 12...

Page 3: ...L17000 ZDNY TL20000 Store this manual where it will be accessible at all times 1 2 Target Group This manual is for qualified electricians The tasks described in this manual only can be performed by qu...

Page 4: ...additional SPD type 3 required for surge protection for electrical devices To protect the a c system surge suppression devices SPD type2 should be fitted at the main incoming point of a c supply at t...

Page 5: ...in the inverter which needs 45 min to discharge Wait 45 min before you open the upper lid or the DC lid Important Safety Instructions When using the product please do remember the below information t...

Page 6: ...circuit capacitors discharge before you unplug DC input and MAINS couplers When access to internal circuit of solar inverter it is very important to wait 45 minutes before working on power circuit or...

Page 7: ...ware and hardware protection Export control Power factor regulation Friendly HMI LED status indications LCD display technical data Human machine interaction through press key RS485 RS232 dry contact c...

Page 8: ...ta 4 1 DC Input Model ZDNY TL 10000 ZDNY TL 12000 ZDNY TL 15000 ZDNY TL 17000 ZDNY TL 20000 Max DC input power W Max DC input Voltage V MPP voltage range V Rated input voltage V Start input voltage V...

Page 9: ...5 60 5 60 5 50 50 50 50 50 Object Quantity Description A B C D E F G H I J K L M N O DZNY series inverter Bracket Warranty card User manual DC connectors 6units 3 positive 3 negative AC connector Expa...

Page 10: ...enough to hold the weight of the inverter If you install the inverter in a cabinet closet or other small enclosed area sufficient air circulation must be provided in order to dissipate the heat genera...

Page 11: ...each one need to use the handles at the sides of the inverter Hang the ZDNY inverter onto the bracket make sure the support on the bracket is xed well with the inverter Step 4 Install the anti theft p...

Page 12: ...biner box correctly Make sure the PV and PV connected correctly 6 0mm trip length Connection Step 1 Disconnect the DC switch 2 Choose the 12 AWG wire to connect the PV module 3 Trip 6mm of insulation...

Page 13: ...ACoutput connection RS485 11mm 25A 1000V 25A 380V Connection type Rated connecting capacity and ratings Tighting torque Stripping length Earth conductor PE screw terminal designed for clamping a cable...

Page 14: ...W provide in all live connections to the AC supply The rated short circuit breaking capacity of the above protective device shall be at least equal to the prospective fault current at the point of ins...

Page 15: ...main DSP and subsidiary DSP The de nition is as below PIN Function PIN1 NC PIN2 TX PIN3 RX PIN4 NC PIN5 RND PIN6 NC PIN7 NC PIN8 NC PIN9 NC You can select which DSP need to be updated by the DIP switc...

Page 16: ...ightly Dry contact Dry contact is provided to give a remote monitor and remote control with the optional accessory The remote monitor function provides an indication on the inverter s working status T...

Page 17: ...n on the external AC and DC connector Turn on the DC switch to the ON position Start inverter Inverter will start automatically when PV panels generate enough energy Check the status of LED and LCD sc...

Page 18: ...troduced as below The condition or the value of PV input Real time power The inverter s output voltage of each phase Daily energy State display Menu interface The menu interface is a transfer interfac...

Page 19: ...4 24 13 11 24 SW OCP DCI Setting User can get the safety time password and connection etc with this function Enter the Setting by select the Setting with cursor on the menu interface and press Ok to c...

Page 20: ...e the cursor to Ok on the top of the screen and press OK to con rm the setting or alternate cursor to back and press OK to cancel the setting The screen will jump to the setting interface after that C...

Page 21: ...eset E today or Reset error log and press OK to con rm After get into Reset E today or reset error log interface Press OK to reset Reset Back Reset E today Reset Error Log H Safety Safety can set the...

Page 22: ...nect them Or seek help from us if can not go back to normal state Faults Diagnosis and solution SampleConsistentFault UnRecover_Relay Fault Current_Sensor_Fault UnRecover_FANXFault EEPROM_WR_Fault GFC...

Page 23: ...ault Please contact with us DCI current over limit Please contact with us Faults Diagnosis and solution SW_OCP_RCD_Jump II SW_OVP_ACRMS SW_OverTemp Residual current detector device fault or residual c...

Page 24: ...During the process of using the inverter the manage person shall examine and maintain the machine regularly The concrete operations are follow 1 Check that if the inlet and oulet of the inverter are b...

Page 25: ...and Australia Belgium Comply with the local grid Comply with the local grid Comply with the local grid Comply with the local grid Comply with the local grid The reconnection time can be adjust from 20...

Reviews: