background image

2.2 Important Safety Instructions

CAUTION

!

Danger of burn injuries due to hot enclosure parts!

During operation, the upper lid of the enclosure and the 
enclosure body may become hot.
Only touch the lower enclosure lid during operation.

CAUTION

!

Possible damage to health as a result of the effects of radiation!

Do not stay closer than 20 cm to inverter for any length of time.

NOTE

!

Grounding the PV generator. 

Comply with the local requirements for grounding the PV
modules and  the PV generator. SolaX recommends connecting     
the generator frame and other electrically conductive surfaces 
in a manner which ensures continuous conduction and ground  
these in order to have optimal protection of system and persons.

WARNING

!

Ensure  input  DC  voltage  ≤Max.  DC  voltage  .Over  voltage  may 
cause permanent damage to inverter or other losses, which will 
not be included in warranty! 

Prior to the application, please read this section carefully to ensure correct and 
safe application. Please keep the user manual properly.
Use only attachments recommended or sold by SolaX. Otherwise may result in 
a risk of fire, electric shock, or injury to person.
Make  sure  that  existing  wiring  is  in  good  condition  and  that  wire  is  not 
undersized. 
Do  not  disassemble  any  parts  of  inverter  which  are  not  mentioned  in 
installation  guide.  It  contains  no  user-serviceable  parts.  See  Warranty  for 
instructions  on  obtaining  service.  Attempting  to  service  the  X1  Series  inverter 
yourself may result in a risk of electric shock or fire and will void your warranty. 
Keep away from flammable, explosive materials to avoid fire disaster.
The installation place should be away from humid or corrosive substance.
Authorized  service  personnel  must  use  insulated  tools  when  installing  or 
working with this equipment.
PV modules shall have an IEC 61730 class A rating.
Never touch either the positive or negative pole of PV connecting device.

 Strictly 

prohibit touching both of them at the same time.

 

The unit contains capacitors that remain charged to a potentially lethal voltage
after the MAINS and PV supply has been disconnected.
Hazardous voltage will present for up to 5 minutes after disconnection from power 
supply.
CAUTION-RISK of electric shock from energy stored in capacitor,. Never operate on 
the solar inverter couplers,  The MAINS cables, PV cables or the PV generator when 
power is applied. After switching off the PV  and Mains, always wait for 5minutes to 
let the intermediate circuit capacitors discharge before you unplug DC and MAINS 
couplers.
When accessing  the internal circuit of solar inverter, it is very important to wait 5 
minutes before operating the  power circuit or demounting the electrolyte 
capacitors inside the device. Do not open the device before hand since the 
capacitors

time to sufficiently discharge!

 require 

Measure the voltage between terminals U

DC

+ and U

DC

- with a multi-meter 

(impedance at least 1Mohm) to ensure that the device is discharged before
beginning work (35VDC) inside the device.

        

Safety

Safety

07

06

Do not operate the  inverter when the device is running.

WARNING

!

Risk of electric shock!

WARNING

!

DANGER!

Danger to life due to high voltages in the inverter!
All work  must be carried out by qualified electrician.
The appliance is not to be used by children or persons with                  
reduced physical sensory or mental capabilities, or lack of 
experience and knowledge, unless they have been given 
supervision or instruction.
Children should be supervised to ensure that they do not play 
with the appliance.

WARNING

Authorized  service  personnel  must  disconnect  both  AC  and  DC 
power  from  X1  series  before  attempting  any  maintenance  or 
cleaning or working on any circuits connected to the X1 series.

 

Summary of Contents for X1 Series

Page 1: ...ual belongs to Solax Power Network Technology Zhe jiang Co Ltd Any corporation or individual should not plagiarize partitially or fully copy including software etc and no reproduction or distribution of it in any form or by any means All rights reserved SolaX Power Network Technology Zhe jiang Co Ltd reserves the right of final interpretation ...

Page 2: ...erter 3 3 Dimension 4 Technical Data 4 1 DC Input 4 2 AC Output 4 3 Efficiency Safety and Protection 4 4 General Data 5 Installation 5 1 Check for Transport Damage 5 2 Packing Lists 5 3 Installation Precaution 5 4 Installation Steps 5 5 Connections of the Inverter 5 6 Run the Inverter 6 Operation Method 6 1 Control Panel 6 2 LCD Structure 6 3 LCD Operation Contents 01 03 03 03 03 04 04 06 09 10 11...

Page 3: ...s document as described below 1 Notes on this Manual 7 Troubleshooting 7 1 Troubleshooting 7 2 Routine Maintenance 8 Decommissioning 8 1 Dismantling the Inverter 8 2 Packaging 8 3 Storage and Transportation Notes on this Manual Contents 03 02 36 36 39 40 40 40 40 X1 3 0 T D L X1 3 3 T D L X1 4 2 T D L X1 3 6 T D L X1 3 0 T N L X1 3 3 T N L X1 3 6 T N L X1 4 2 T N L X1 4 6 T D L X1 5 0 T D L X1 5 9...

Page 4: ... and the PV generator if the voltage protection level VP of the surge arresters is greater than 1100V anadditional SPD type3requiredforsurgeprotection for electrical devices To protect the AC system surge suppression devices SPD type2 should be fitted at the main incoming point of AC supply at the consumer s cutout located between the inverter and the meter distribution system SPD test impulse D1 ...

Page 5: ...working with this equipment PV modules shall have an IEC 61730 class A rating Never touch either the positive or negative pole of PV connecting device Strictly prohibit touching both of them at the same time The unit contains capacitors that remain charged to a potentially lethal voltage after the MAINS and PV supply has been disconnected Hazardous voltage will present for up to 5 minutes after di...

Page 6: ...roduct For United Kingdom The installation that connects the equipment to the supply terminals shall comply with the requirements of BS 7671 Electrical installation of PV system shall comply with requirements of BS 7671 and IEC 60364 7 712 No protection settings can be altered Installer shall ensure that equipment is so installed and operated to maintain at all times compliance with the requiremen...

Page 7: ...regulations depends upon installing and configuring system correctly including using the specified wires The system must be installed only by professional assemblers who are familiar with requirements for safety and EMC The assembler is responsible for ensuring that the end system complies with all the relevant laws in the country where it is to be used The individual subassembly of the system sha...

Page 8: ...tch optional Waterproof Lock Valve DC Connector USB for Upgrade Pocket WiFi LAN GPRS optional B C D E F G H Description RS 485 Meter DRM optional AC Connector Ground screw 12 13 Introduction Technical Data X1 3 0 T D X1 3 3 T D X1 3 6 T D X1 4 2 T D X1 4 6 T D Model X1 T N 5 3 5 98 5300 5980 600 70 580 220 500 12 12 12 8 12 8 80 100 2 1 X1 T D 5 3 5 98 5000 21 7 22 7 33 92 2 0 8 leading 0 8lagging...

Page 9: ...f there are some visible damages such as cracks please contact your dealer immediately Open the package and fetch out the product check the accessories at first The packing list shows as below 14 15 Technical Data Installation 13 5 13 5 14 5 14 5 16 0 16 0 17 0 17 0 99 90 97 00 97 80 14 5 17 0 13 5 16 0 Object X1 series inverter with bracket 1 A B C D E F G H I J K 4 1 3 3 1 1 1 1 DC connector AC ...

Page 10: ...ping pliers for binding post screwdriver manual wrench and Φ10 driller b Use the wall bracket as a template to mark the position of the 3 holes on the wall c Drill holes with driller make sure the holes are deep enough at least 50mm for installation and then tighten the expansion tubes d Install the expansion tubes in the holes and tighten them Then install the wall bracket by using the expansion ...

Page 11: ...3 T N X1 5 98 T N is purchased X1 3 0 T N X1 3 3 T N X1 3 6 T N X1 4 2 T N X1 4 6 T N X1 3 0 T D X1 3 3 T D X1 3 6 T D X1 4 2 T D X1 4 6 T D X1 5 0 T N X1 5 0 T D DANGER Danger to life due to high voltages on DC conductors When exposed to sunlight the PV array generates dangerous DC voltage which is present in the DC conductors Touching the DC conductors can lead to lethal electric shocks Cover th...

Page 12: ...m 5mm 20A 20A 20A 25A 32A d Separate the AC plug into three parts as below Hold the middle part of the female insert rotate the back shell to loose it and datach it from female inset Remove the cable nut with rubber insert from the back shell e Slide the cable nut and then back shell onto the cable f Insert the tripped end of each three wires into the appropriate hole in the female insert and then...

Page 13: ...s to the PV array feedback current to the array is 25A 250VAC for 3 0KW and 3 3KW 32A 250VAC for 3 6KW 4 2KW 4 6KW 5 0KW 5 3KW and 5 98KW based on the fuse provided in the mains Also in the worst case the reverse current comprises the sum of the short circuit currents of all intact lines Therefore the current carrying capacity of the components and sub assemblies provided in the end use system con...

Page 14: ...to support several demand response modes by giving control signals as below The user should short circuit between 1 and 2 and cooperate with external equipment when using it 1 8 DRM 24 Installation Installation With this single phase meter working together with the X1 series you can 1 Monitor the energy to grid and from grid through the whole day 2 Achieve the export control function with a higher...

Page 15: ...he PV connector then pull off the U disk screw the waterproof lid Note Vx xx is version number xxxxxxxx is file completion date 4 Press up and down to select the one that you want to update and long press down to confirm U disk Straight screwdriver Waterproof lid torque 1 5 0 2Nm Ø Update ARM Updating 25 Make sure the input voltage is more than 100V in good illumination condition or it may result ...

Page 16: ...xceeds 100V and PV panels have enough energy to start inverter Normal Inverter begins to operate normally with blue light on Meanwhile feedback energy to grid LCD displays present output power Enter the setting interface to follow the instructions when it is rst time to start up Ø Ø Ø 29 WARNING Power to the unit must be turned on only after installation work has been completed All electrical conn...

Page 17: ...Back Enter Export Control Mode Select Enable Enter Back Up Down Mode Select Enable Reset No Reset No User value 4000W Enter Back Enter Back Enter Back Enter Back Earth Detect Mode Select Disable Enter Mode Select Disable Enter Up Down Line Impedance Up Down Back Back Mode Select Disable Enter Mode Select Disable Enter Self Test Up Down Back All Test Enter Test Report Only for Italy Power 0W Normal...

Page 18: ...re leaving factory according to safety rules If need to reset any changes should according to the requirement of local grid LCD Display Ø Parameter Comment Normally Vac upper Voltage high protect Vac lower Voltage low protect Vac upper slow Voltage high slow protect Vac lower slow Voltage low slow protect Fac upper Frequency high protect Fac lower Frequency low protect Fac upper slow Frequency hig...

Page 19: ...long press again to modify b Short Press Λ or V to increase or decrease the value you needed c After setting long press the V key to confirm the parameters d Long press Λ to enter next level The way to operate the value a Just watch the parameter of the mode by short pressing Λ and V b If you change other mode by short pressing Λ and V you need return the Power Factor interface by long pressing th...

Page 20: ...ted in troubleshooting lists 36 37 Troubleshooting Troubleshooting Contact SolaX Customer Service for further assistance Please be prepared to describe details of your system installation and provide model and serial number of the unit If your inverter s information panel is not displaying a Fault light check the following list to make sure that the present state of the installation allows proper ...

Page 21: ... periodically Only qualified person may perform the following works During the process of using the inverter the manage person shall examine and maintain the machine regularly The concrete operations are follow 1 Check that if the cooling fins on the rear of house are covered by dirts and the machine should be cleaned and absorbed dust when necessary This work shall be check time to time 2 Check t...

Page 22: ...d 8 3 Storage and Transportation Store the inverter in dry place where ambient temperatures are always between 25 C 60 C Take care of the inverter during the storage and transportation keep less than 4 cartons in one stack 8 2 Packaging When the inverter or other related components need to be disposed Have it carried out according to local waste handling regulations Please be sure to deliver waste...

Reviews: