![Solas ONE6 Installation & Operation Manual Download Page 27](http://html1.mh-extra.com/html/solas/one6/one6_installation-and-operation-manual_1314167027.webp)
solasfires.com
27
STARTER PIPE INSTALLATION
9. Install the outer heat shield, align the three tabs with
the 3 pilot holes in the firebox heat shield access
panel. Using a 5/16” nut driver, secure the outer heat
shield using 3x #10 sheet metal screws provided.
10. Using a 5/16” nut driver, reinstall the outer can vent
access panel using the 8x #10 sheet metal screws
saved from step #2 on page 25.
The Starter pipe and required telescoping heat shields
are now installed, the unit is ready for the next step of
the installation.
ATTENTION
Once the unit is installed, test burn the fireplace
for at least 30 minutes to confirm that the unit is
performing as expected before enclosing the unit
within the wall while the vent pipe is still accessible.
Failure to test burn the fireplace may result in costly
repairs not covered by the manufacturer’s warranty.