Subject to change | © 2019 SOLARWATT GmbH | AZ-TM-PMS-1339 | Rev 001 | Version: 12/2019
Page 3
6.3
Module installation............................................................................................................. 20
6.3.1 Positioning the first module
............................................................................................. 20
6.3.2 Fastening the first module of the lowest module row
............................................... 21
6.3.3 Module earthing .................................................................................................................. 22
6.3.4 Transverse seal installation .............................................................................................. 22
6.3.5 Fastening the second module of the lowest module row ......................................... 24
6.3.6 Installing the third module ............................................................................................... 25
6.3.7 Installation of the next modules ..................................................................................... 25
6.4
Module connection at the top module field edge
....................................................... 26
6.5
Side module connection ................................................................................................... 27
6.6
Cable ducting through the roof ....................................................................................... 28
6.7
Installation of the roof top enclosure frame ................................................................ 29
7
The principle of rear ventilation ............................................. 29
8
System components ................................................................ 30
8.1
Delivery scope ..................................................................................................................... 30
8.2
Parts not included in the delivery scope ....................................................................... 32
9 Appendix ................................................................................. 33
9.1
Batten layout, vertically from bottom to top. ............................................................... 33
9.2
Transition design (aluminium guide - adjacent batten) ............................................. 33
9.3
Total spacing D and LA for different roof tiles
............................................................. 35
9.4
Batten spacings under module field for 1-4 module rows
........................................ 36
9.5
Design guidelines for your own enclosure frames ..................................................... 37
9.6
Warranty Conditions .......................................................................................................... 38