![SOLARFOCUS PelletElegance 10 Manual Download Page 23](http://html1.mh-extra.com/html/solarfocus/pelletelegance-10/pelletelegance-10_manual_1313812023.webp)
6 Hydraulic equipment
i
Earthing of the pellet hoses is also required for
the manually actuated variant of the diverter
for suction heads (Art. 68190).
6 Hydraulic equipment
Various hydraulic variants are available for the
pellet
elegance
boiler.
Up to two heating circuits and a switching valve can
be optionally integrated into the boiler for the purpose
of charging the DHW tank.
The basic equipment is installed in the boiler at the
factory, while the optional extras are installed on site.
i
If the
pellet
elegance
boiler is installed with a
condensing module, we recommend installing
the condensing module BEFORE installing
the hydraulic extensions (for better acces-
sibility during installation).
6.1 Information about installing the
hydraulic extensions
Preassembled pump groups
!
ATTENTION
– The pump groups in the
hydraulic extension packs are factory pre-
assembled, the clamping rings must be tigh-
tened on-site during assembly.
Installing the clamping ring fitting
►
Push the fitting onto the pipe as far as it will go
and
manually tighten
the lock nut.
►
Tighten the lock nut with a suitable tool (e.g.
adjustable open-ended spanner),
tighten with
another ¾ turn
after manual fitting. (Value app-
lies to pipe diameter of 22 mm and steel pipe).
i
Do not use a pipe wrench to tighten the lock
nut!
Installation manual
pelletelegance
23