![SolarEdge StorEdge SE10K-RWS Installation Manual Download Page 18](http://html1.mh-extra.com/html/solaredge/storedge-se10k-rws/storedge-se10k-rws_installation-manual_1313754018.webp)
P860 and M1600 power optimizers
Figure 2: Power optimizer clearance
When installing PV modules in a confined space such as Building-integrated
photovoltaic (BIPV) modules, ventilation measures may be required to ensure that
the power optimizers are not exceeding the maximum temperatures stated in their
specifications.
Chapter 2: Installing the Power Optimizers
17
StorEdge Three Phase Inverter MAN-01-00648-1.3