For CAN

Six-wire shielded twisted pair cable with RJ45 connector

CAT5/6 twisted pair straight Ethernet cable with RJ45 connector

For connecting the battery to the inverter, use copper cables with the following 

parameters:

Maximum length: 5m

Cross-section area: 35 or 50 mm

2

Crimping tools

Shrinking tools

Inverter Transport and Storage

Transport the inverter in its original packaging, facing up and without exposing it to 

unnecessary shocks. If the original package is no longer available, use a similar box that 

can withstand the weight of the inverter (refer to the inverter weight in the specification 

datasheet provided with the unit), has a handle system and can be closed fully.

Store the inverter in a dry place where ambient temperatures are -25°C to +65°C /

 -13°F to 149°F.

StorEdge Three Phase Inverter MAN-01-00648-1.3

12

   Inverter Transport and Storage

Summary of Contents for StorEdge SE10K-RWS

Page 1: ...Installation Guide StorEdge Three Phase Inverter For Europe and APAC Version 1 3...

Page 2: ...ny time and without notice You may refer to the SolarEdge web site www solaredge com for the most updated version All company and brand products and service names are trademarks or registered trademar...

Page 3: ...this equipment does cause harmful interference to radio or television reception which can be determined by turning the equipment off and on you are encouraged to try to correct the interference by one...

Page 4: ...roper Power Optimizer Connection 20 Chapter 3 Installing the Inverter 21 Inverter Package Contents 21 Identifying the Inverter 21 Inverter Interfaces 22 Mounting the Inverter 26 Selecting a Residual C...

Page 5: ...5 Bus Connection 52 RS485 Bus Configuration 55 Verifying the Connection 55 Reporting and Monitoring Installation Data 56 Appendix A Errors and Troubleshooting 59 Identifying Errors 59 Troubleshooting...

Page 6: ...nverter clearance added a link to Application Note Clearance Guidelines in Mounting the Inverter on page 26 Added Opening the Inverter Cover on page 31 Added Closing the Inverter Cover on page 39 Upda...

Page 7: ...tly performed or adhered to could result in damage or destruction of the product Do not proceed beyond a caution sign until the indicated conditions are fully understood and met NOTE Denotes additiona...

Page 8: ...h IEC60947 3 when installing the system with a worst case SafeDC voltage under fault conditions 120V The worst case voltage is defined as Voc max String Length 1 1V where Voc max Maximum Voc at lowest...

Page 9: ...rce to SolarEdge inverter refer to https www solaredge com sites default files se inverter support of voltage sources pdf NOTE The following warning symbols appear on the inverter warning label Risk o...

Page 10: ...NOTE For battery decommissioning and disposal follow the manufacturer requirements and instructions HANDLING AND SAFETY INSTRUCTIONS 9 StorEdge Three Phase Inverter MAN 01 00648 1 3...

Page 11: ...Solution Components StorEdge Inverter is connected to a battery and supplies control and monitoring signals to the battery for operation in addition to its traditional functionality as a DC optimized...

Page 12: ...on contact voltage detector Cordless drill with a torque clutch or screwdriver and bits suitable for the surface on which the inverter and optimizers will be installed Use of an impact driver is not a...

Page 13: ...Storage Transport the inverter in its original packaging facing up and without exposing it to unnecessary shocks If the original package is no longer available use a similar box that can withstand the...

Page 14: ...ptimizer must be operated according to the technical specifications provided with the power optimizer CAUTION Cutting the power optimizer input or output cable connector is prohibited and will void th...

Page 15: ...ule connector manufacturer should explicitly verify compatibility with the SolarEdge optimizerconnectors and the Inverter DC input connectors A third party test report by one of the listed external la...

Page 16: ...42 2019 as indicated in the serial number Example S N SJ5019A xxxxxxxx working week 50 2019 extension cables of up to 16 m can be installed per power optimizer 8 m for DC and 8 m for DC Between two p...

Page 17: ...heir cables can be connected Make sure to use power optimizers that have the required output and input conductor length Completely shaded modules may cause their power optimizers to temporarily shut d...

Page 18: ...ined space such as Building integrated photovoltaic BIPV modules ventilation measures may be required to ensure that the power optimizers are not exceeding the maximum temperatures stated in their spe...

Page 19: ...power optimizer or through the mounting holes 3 Attach each power optimizer to the rack using M6 1 4 stainless steel bolts nuts and washers or other mounting hardware Apply torque of 9 10 N m 6 5 7 lb...

Page 20: ...the Minus output connector of the string s first power optimizer to the Plus output connector of the string s second power optimizer 2 To minimize electromagnetic interference EMI make sure to minimi...

Page 21: ...ystems For more information about the SolarEdge system s string voltage and current refer to the VOC and ISC in SolarEdge Systems Technical Note available on the SolarEdge website at https www solared...

Page 22: ...s for fastening the inverter to the mounting bracket Installation guide Two 48 mm ferrite beads One 39 mm ferrite bead Lugs and M8 screws for connecting battery cables on the inverter side Heat shrink...

Page 23: ...tions Each gland has three openings Battery DC inputs Two battery glands for connecting charging cables and ON OFF P switch ON 1 Turning this switch ON after power optimizer pairing starts the operati...

Page 24: ...nds then released Starts pairing Pairing is indicated by all 3 LEDs blinking simultaneously LEDs LEDs three LEDs indicate by color and state on off blinking 1 flickering 2 alternating 3 different syst...

Page 25: ...with the monitoring platform is established Pairing Blinking Blinking Blinking Wake up Grid Monitoring OFF Blinking Blinking System Producing OFF ON S_OK ON No S_OK OFF Night mode no production OFF Fl...

Page 26: ...describes production percentage of AC information by LED color and ON OFF P switch position Indication ON OFF P Switch Position LED Color Comment Red Green Blue Percentage of AC Production 0 ON 1 OFF...

Page 27: ...the inverter or power optimizer For SolarEdge inverters installed at a distance of 200 m 655 ft or closer to the shoreline special brackets purchased separately from SolarEdge and SS304 stainless scr...

Page 28: ...ind the top mounting hole of the bracket Depending on the angle use the appropriate size and number of spacers so that the bracket is perpendicular to the ground Recommended a stainless steel 3 4 long...

Page 29: ...ll the cover horizontally before lowering it Selecting a Residual Current Device RCD IMPORTANT SAFETY FEATURE All SolarEdge inverters incorporate a certified internal Residual Current Device RCD in or...

Page 30: ...ommended to avoid nuisance tripping of the external RCD Select the appropriate RCD for correct operation of the installation An RCD with a rating of 30 mA may actually trip at a leakage as low as 15 m...

Page 31: ...h is OFF For easy access to battery connectors it is recommended to connect the cables to the battery and to set all battery DIP switches to their correct positions before mounting the battery Measure...

Page 32: ...g the Inverter Cover 1 Switch the inverter ON OFF P switch to OFF Wait 5 minutes for the capacitors to discharge 2 Disconnect AC to the inverter by turning off the circuit breaker on the distribution...

Page 33: ...holding the inverter cover and remove the cover CAUTION When removing the cover make sure not to damage internal components SolarEdge will not be held responsible for any components damaged as a resu...

Page 34: ...N m 0 88 1 1 lb ft 9 Check that the wires are fully inserted and cannot be pulled out easily 10 Tighten the AC gland with a torque of 2 8 3 3 N m 2 0 2 4 lb ft 11 Verify that there are no unconnected...

Page 35: ...ach string to the DC and DC connectors See Figure 4 Figure 12 Inverter DC Connections Connecting the Energy Meter For Smart Energy Management applications such as maximizing self consumption the StorE...

Page 36: ...d of the communication cable through the gland Figure 13 Meter Connection 3 Remove the 3 pin connector from the RS485 1 port on the communication board and loosen its screws StorEdge Three Phase Inver...

Page 37: ...g the Battery WARNING The battery must be powered off before and during wiring For connecting the battery to the inverter use copper cables with the following parameters Maximum length 5m Cross sectio...

Page 38: ...ables at correct polarity Connecting the power cables at reverse polarity may result in damage to the inverter or battery 8 Connect the DC cables to the battery terminals of the inverter Tighten the t...

Page 39: ...connector 3 Set the DIP switches on the CAN bus board Two right DIP switches Switch to ON Left DIP switch PIN 2 PIN 6 Selects a grounding PIN for the CAN bus connector Set according to battery manufac...

Page 40: ...ing hole on the side of the inverter as shown below Use an M6 screw Figure 18 Grounding the battery Closing the Inverter Cover 1 Mount the cover 2 Fasten all bolts slightly with a hand so that they ho...

Page 41: ...3 Fasten all bolts to a torque of 4 N m in the order shown below Chapter 5 Connecting the Inverter 40 StorEdge Three Phase Inverter MAN 01 00648 1 3...

Page 42: ...is created between the mobile device and the inverter and the system firmware is upgraded Before activation Download register first time only and log in to SetApp on your mobile device Verify that th...

Page 43: ...n instructions scan the inverter QR code move the ON OFF P switch to P position for 2 seconds and release The mobile device creates a Wi Fi connection with the inverter and displays the main Commissio...

Page 44: ...er enters Wake up mode until its working voltage is reached This mode is indicated by the flickering green inverter LED When working voltage is reached the inverter enters Production mode and produces...

Page 45: ...t Status and verify that inverter is operating and producing power 3 Verify that the number of paired optimizers is the same as the number of physically installed power optimizers 4 Verify that additi...

Page 46: ...ng Maintenance Diagnostics Self Test Battery Self Test Run Test 4 Wait for all tests to complete and check the results in the summary table If any of the tests have failed see the table below for poss...

Page 47: ...ergy Manager Energy Control Maximum Self Consumption 3 Optionally set the battery OFF periods as follows a Select Set Operation and then select a month from the list that appears b Select a month A li...

Page 48: ...ng types of communication can be used to transfer the monitored information from the inverter to the monitoring platform Only communication products offered by SolarEdge are supported Ethernet Etherne...

Page 49: ...lt files se cellular plug in for inverters with setapp installation guide pdf ZigBee This option enables wireless connection to one or several Smart Energy products which automatically divert PV energ...

Page 50: ...Gland 1 CAUTION The gland includes a rubber waterproof fitting which should be used to ensure proper sealing 3 Remove the plastic seal from one of the large openings 4 Remove the rubber fitting from t...

Page 51: ...using a spool of cable connect as follows a Insert the cable through Commuication Gland 1 b Remove the cable s external insulation using a crimping tool or cable cutter and expose eight wires c Inser...

Page 52: ...y to the monitoring platform 9 The inverter is configured by default to LAN If reconfiguration is required a Make sure the ON OFF P switch is OFF b Turn ON the AC to the inverter by turning ON the cir...

Page 53: ...r details refer to https www solaredge com sites default files lightning_ surge_protection pdf If grounded metal conduits are used for routing the communication wires a lightning protection device is...

Page 54: ...A and G connections as long as The same color wire is used for all A pins the same color for all B pins and the same color for all G pins The wire for G is not from the same twisted pair as A or B 5...

Page 55: ...Terminate the first and last SolarEdge inverter in the chain The inverer can be terminated by switching on up the left DIP switch on the communication board Figure 24 RS485 termination switch NOTE On...

Page 56: ...ess SetApp as described in Communication on page 43 4 From the Commissioning screen select Site Communication RS485 2 Protocol SolarEdge SolarEdge Leader 5 Return to the RS485 2 screen and select Foll...

Page 57: ...ding up to date information viewed in a physical or logical view Logical Layout Shows a schematic tree layout of the components in the system such as inverters optimizers strings modules meters and se...

Page 58: ...ut to the monitoring platform For more information refer to https www solaredge com products installer tools designer Mapper Application Use the Mapper smart phone application to scan the power optimi...

Page 59: ...s details about its logical and physical mapping Using a Paper Template Fill out the Physical Layout Template downloadable from the SolarEdge website http www solaredge com files pdfs physical layout...

Page 60: ...r types use the methods described below To identify the error type using the inverter LEDs 1 Move the ON OFF P switch to P position for 2 seconds and release it 2 Observe the LED lights and use the fo...

Page 61: ...onnection No Internet connection Ping to google com failed Connect a laptop and check for internet connection If internet access is unavailable contact your IT admin or your internet provider For Wi F...

Page 62: ...7E Low battery voltage Verify that the battery is connected to the inverter as required 1Dx88 Internal communication error Verify that the RS485 connector on the communication board is connected as re...

Page 63: ...ely during sunlight Make sure to leave the inverter ON OFF P switch ON and that S_OK appears in the status screen String voltage is 0V Power optimizer s output is disconnected Connect all power optimi...

Page 64: ...ted in the string and that no module outputs are connected without a power optimizer If the problem persists proceed to the next step Power optimizer s malfunction 1 Disconnect the wires connecting th...

Page 65: ...ical Specifications The following figure provides inverter dimensions in mm in Figure 25 StorEdge Three Phase Inverter dimensions Appendix B Mechanical Specifications 64 StorEdge Three Phase Inverter...

Page 66: ...the inverter P ON OFF switch to OFF 0 and wait 5 minutes for the capacitors to discharge 2 Disconnect the AC to the inverter by turning OFF the circuit breakers on the distribution panel WARNING SafeD...

Page 67: ...Phase 8 11 5 13 16 A Residual Current Detector Residual Current Step Detector 300 30 mA Grids Supported Three Phase 3 N PE WYE with Neutral Utility Monitoring Islanding Protection Configurable Power F...

Page 68: ...0178 IEC 62109 Grid Connection Standards 2 VDE 0126 1 1 VDE AR N 4105 AS 4777 G83 G59 Emissions IEC61000 6 2 IEC61000 6 3 IEC61000 3 11 IEC61000 3 12 RoHS Yes INSTALLATION SPECIFICATIONS AC Output Cab...

Page 69: ...Protection Rating IP65 Outdoor and Indoor Mounting Bracket provided StorEdge Three Phase Inverter Technical Specifications 68 StorEdge Three Phase Inverter MAN 01 00648 1 3...

Page 70: ...rror indicated on the product SetApp mobile application or on the monitoring platform or by the LEDs if there is such an indication System configuration information including the type and number of mo...

Page 71: ......

Reviews: