d. Connect the cable wires to the 7-pin connector, as shown below, and reconnect
the connector to the slot:
Figure 10: Communication and 12V cables connection between Backup Interface and
Inverter
3. Connect the cables to the Backup Interface:
a. Pass the cables through the Com 1 conduit.
b. Remove the 7-pin connector from the Backup Interface's communication slot.
c. Connect the communication cable to the 7-pin connector, as shown above. If
there is a short circuit jumper between the RSD terminals of the inverter, remove
it before connecting the RSD terminals to the Backup Interface.
d. Reconnect the 7-pin connector to the communication slot.
e. Move up (ON) the communication DIP switch.
Figure 11: Communication DIP switch setup
To connect to the AC cable
1. Connect one end of the AC cable to the AC terminal block in the inverter's
Connection Unit, as explained in the Single phase energy hub inverter with prism
technology Installation Guide.