
5. Drill two holes where marked.
Figure 5: Drilling holes
6. Install the conduit holder.
7. Tighten the conduit holder to the mounting surface with two screws.
Figure 6: Securing the conduit holder with screws
8. Tighten the conduit holder to the outer left fin with the supplied screw. Tighten the
screw with a torque of 41 lb*in / 4.7 N*m.
Backup Interface Installation Guide MAN-01-00728-1.0
12
Installing the Conduit Holder
Summary of Contents for StorEdge BI-NUSGN-01
Page 30: ......