Configuration with Inverters with SetApp
Required inverter Firmware CPU version : v4.7xx and later.
To associate the Smart Energy device with the inverter using SetApp:
1. Access SetApp as described in the
Inverter Installation Guide.
2. Select
Commissioning > Communication > ZigBee > Protocol > Home Automation
.
3. Return to the
Commissioning
screen.
4. Select
Device Manager
. The
Smart Energy Manager
screen is displayed.
5. Select
Add Devices
to start device association with the inverter. A 3 minute
countdown starts.
6. Within the 3-minute time, press and hold the association button for 2 seconds.
SetApp indicates that the device has been associated.
7. After all required devices have been associated, tap
Stop
in the Smart Energy
Manager to exit.
To configure the Smart Energy device:
1. Go to the monitoring platform web-site on your computer, or open the monitoring
platform application on your mobile device.
2. Click/tap the
Smart Energy
icon.
3. Select a device and go to
Details and Settings
.
4. Complete the following information:
Rated power
Min active time
Device icon
Device name
5. Return to the device screen and configure:
Schedules
Ready-by timers
Excess Solar Power mode (requires a SolarEdge Energy Meter)
Device state
Smart Energy Relay Installation Guide
16
Configuration with Inverters with SetApp
Summary of Contents for Smart Energy Relay
Page 1: ...Installation Guide Smart Energy Relay Version 1 3...
Page 23: ......