![SolarEdge SEK-I Series Installation Manual Download Page 5](http://html1.mh-extra.com/html/solaredge/sek-i-series/sek-i-series_installation-manual_1313744005.webp)
Contents
HANDLING AND SAFETY INSTRUCTIONS
IMPORTANT SAFETY INSTRUCTIONS / CONSIGNES DE SÉCURITÉ
IMPORTANTES
Photovoltaic Rapid Shutdown System Requirements
Chapter 1: Introducing the SolarEdge Power Harvesting System
Three Phase Inverter with Synergy Technology
Installation Tools and Material List
Chapter 2: Installing the Power Optimizers
Step 1: Mounting and Grounding the Power Optimizers
Step 2: Connecting a PV module to a Power Optimizer
Step 3: Connecting Power Optimizers in Strings
Step 4: Verifying Proper Power Optimizer Connection
Chapter 3: Installing the Synergy Manager and Synergy Units
Synergy Manager Package Contents
Front Interface of Synergy Manager
Inverter Interconnection Cable Interfaces
Synergy Manager External Cable Interface
Synergy Unit Interface Connectors
Mounting and Connecting the Synergy Manager and Synergy Units
Chapter 4: Connecting AC and PV Strings to the Synergy Manager
Connecting the AC Grid to the Synergy Manager
Connecting the PV Strings to the Synergy Manager
Connecting Ground and AC to the Synergy Manager
Three Phase Inverter with Synergy Technology P/N: SExxK-xxxxIxxxx SExxK-xxxxIxxxx
4
Revision History
Summary of Contents for SEK-I Series
Page 92: ......