![SolarEdge SEK-I Series Installation Manual Download Page 30](http://html1.mh-extra.com/html/solaredge/sek-i-series/sek-i-series_installation-manual_1313744030.webp)
Front Interface of Synergy Manager
Figure 9: Synergy Manager Unit - Front interfaces
NOTE
Some models Synergy Manager do not include DC Disconnect Switch.
DC Disconnect Switch
The DC Disconnect Switch
is a manually operated safety switch for disconnecting the
DC power of the SolarEdge system.
NOTE
When the Synergy Manager is OFF (for example during maintenance) it may
be locked to prevent a safety hazard:
1. Move the switch to the Lock position.
2. Insert the lock through the knob opening
and lock.
ON/OFF/P Switch
Figure 10 shows the ON/OFF/P switch of the Synergy Manager.
Figure 10: ON/OFF/P switch
Three Phase Inverter with Synergy Technology P/N: SExxK-xxxxIxxxx SExxK-xxxxIxxxx
29
Front Interface of Synergy Manager
Summary of Contents for SEK-I Series
Page 92: ......