NOTE
SolarEdge inverters with “Grid Support” functionality (as marked on the
inverter certification label), are compliant with UL 1741 Supplement A. The
functionality is built into the inverter and no additional external device is
required.
Device Manager
From the
Commissioning
menu, select
Device Manager
to configure various system
Smart Energy Management devices.
https://www.solaredge.com/products/device-
Maintenance
From the
Commissioning
menu, select
Maintenance
to configure various
system settings, as described below.
Date and Time: Set the internal real-time clock. If connected to the monitoring
platform, the date and time are set automatically and only time zone should be
set.
Reset Counters: Resets the accumulated energy counters that are sent to the
monitoring platform
Factory Reset: Performs a general reset to the default device settings.
Arc Fault Circuit Interrupter (AFCI): Enables or disables production interruption
in case of arc-fault, sets the reconnection mode, and enables or disables manual
AFCI self-test.
http://www.solaredge.com/sites/default/files/arc_fault_
detection_application_note_na.pdf
.
Firmware Upgrade: Perform a software upgrade.
Diagnostics: Displays the Isolation status and power optimizer
status screens. Refer to
https://www.solaredge.com/sites/default/files/application_note_
isolation_fault_troubleshooting.pdf
Activate Standby Mode
: Enables/disables Standby Mode - for
remote commissioning.
Grid Protection
: Available in specific countries. Enables viewing and setting grid
protection values.
Chapter 5: Activating, Commissioning and Configuring the System Using the