c. Insert the supplied screw through the right side of the heat sink and into the
bracket.
Figure 16: Hanging units
NOTE
If connecting secondary grounding, the grounding cable on either side of
the chassis, to the upper mounting screw or to the lower grounding screw,
before hanging the unit on the bracket, see
Grounding to the Connection Unit on page 38.
7. Mount the Secondary Unit(s):
There is no specific order for hanging the Secondary Units.
When installing a 2 unit inverter, mount the Secondary Unit to the left of
the Primary Unit.
Lift the Secondary Unit(s) from the sides, or hold it at the top and
bottom of the unit to lift into place.
Align the two indentations in the enclosure with the two triangular
mounting tabs of the bracket, and lower the unit until it rests on the
Insert one of the supplied screws through the outer side of the heat
sink and into the bracket. Tighten the screws with a torque of 4.0N*m /
2.9 lb.*ft.
8. Secure the Connection Unit to the wall:
-
Three Phase Inverter with Synergy Technology Installation MAN-01-00402-1.2
32
Mounting and Connecting the Primary and Secondary Unit(s)