![SolarEdge RESU10H Prime Series Installation Manual Download Page 14](http://html1.mh-extra.com/html/solaredge/resu10h-prime-series/resu10h-prime-series_installation-manual_1313714014.webp)
(2) A rapid shutdown switch shall have a label located on or no more than 3 ft
from the switch that includes this wording. The label shall be reflective, with all
letters capitalized and having a minimum height of 3/8 in., in white on red
background.
Photovoltaic Rapid Shutdown System Requirements
13
Single Phase Energy Hub Inverter with Prism Technology MAN-01-00842-1.3
Summary of Contents for RESU10H Prime Series
Page 81: ......