![SolarEdge RESU10H Prime Series Installation Manual Download Page 12](http://html1.mh-extra.com/html/solaredge/resu10h-prime-series/resu10h-prime-series_installation-manual_1313714012.webp)
LG Chem Prime Battery
Turn off the circuit breaker.
CAUTION!
This unit must be operated under the specified operating conditions as
described in the technical specifications supplied with the unit.
Cette unité doit être opérée suivant les instructions trouvées dans le manuel
fourni avec le produit.
NOTE
The battery used must be NRTL certified.
NOTE
For battery decommissioning and disposal, follow the manufacturer
requirements and instructions.
NOTE
For inverters with a nameplate up to and including 11.4W:
Maximum short circuit peak current: 78.1A
Maximum short circuit current duration (until current stops): 113msec
Maximum 3-cycle short circuit current RMS value: 60A
IMPORTANT SAFETY INSTRUCTIONS
11
Single Phase Energy Hub Inverter with Prism Technology MAN-01-00842-1.3
Summary of Contents for RESU10H Prime Series
Page 81: ......