SOLARACK SR-COMP Installation Manual Download Page 8

Recommended  Placement  &  Spacing  of  Roof  Attachments

Page 7

www.solarackusa.com

1st course

2nd course

3rd course

4th course

48”

72”

IMPORTANT:

Flashing should not overhang a 
downslope shingle or a gap in 
shingle material.

- Roof Rafter

- 9” x 12”
  Compositon

Mounting Instructions: Portrait

Mounting Instructions: Landscape

Please follow this instruction graphic when solar modules
are mounted in portrait alignment. Rail must be mounted 
8”-18” from the top and bottom edge of the solar module.

Some  solar  module  manufacturers  may  have  specific 
requirements  rail  placement  that  differs  from  these
instructions, please check with your module manufacture
for compliance regarding mounting requirements. 

Rail must not exceed 24” cantilever 
past the last attachment. (for 6’ span)

Please  follow  this  instruction  graphic  when  solar  modules
are mounted in landscape alignment. Rail must be mounted 
4”-7”  from  the  top  and  bottom  edge  of  the  solar  module.

Some  solar  module  manufacturers  may  have  specific 
requirements  rail  placement  that  differs  from  these
instructions, please check with your module manufacture
for compliance regarding mounting requirements. 

Rail must not exceed 24” cantilever 
past the last attachment. (for 6’ span)

The  SolaRack®  Comp  Kit  is  optimally  spaced  based  on  local  city  code  and  the  rail  system  used. 
For  measurements  related  to  clearances  and  roof  setbacks,  please  refer  to  your  local  building  and  safety  office  or  other 
authorities  having  jurisdiction.  When  using  the  Comp  Kit  with  SolaRack®  Rails,  attachments  may  be  spaced 
up  to  72”.  For  proper  installation,  please  refer  to  the 

detailed  installation  guide  on  page  11. 

Lag  screw  must  be 

installed in the center of a roof rafter and sealant must be applied under the flashing during installation. Installation must be
preformed  by  licensed  professionals  to  avoid  roof  damage.  Removing  stone  gravels  and  deforming  shingles  in  any  way 
during installation can and will shorten the lifespan of the roofing. Be sure not to install systems on poor quality or damaged 
surfaces.   

© 2018 SOLARACK INC. VR2.1                                       

Summary of Contents for SR-COMP

Page 1: ...Comp Kit Installation Manual 2018 SOLARACK INC VR2 1 INSTALL LIKE A PRO HEX 13 13 One Tool System mm HEX...

Page 2: ...STD 2703 Universal Mid End Clamp Detail Sectional Drawing Design Code References Comp Kit Components Water De ector Required Tools and Torque Values Installation Manual Micro Bolt Installation Manual...

Page 3: ...is in proper condi on prior o installa on Do not in tall on damaged roofs Use only appropriate recommended tools and wear safety goggles and gloves during installa on Page 2 Fire Classi ication UL ST...

Page 4: ...AL 6000 Series SKU SR ECO SK Material Aluminum AL 6000 Series SKU SR STRD SK Material Aluminum AL 6000 Series SKU SR HD SK Material PVC Finish Black PVC SKU SR ECO WM Material PVC Finish Black PVC SK...

Page 5: ...IGB SR LFOOT Material SUS304 Finish Stainless Steel SKU SR ADJF Material SUS304 Finish Stainless Steel SKU SR DADJF Material Aluminum AL 6000 Series Finish Anodized Clear Black SKU SR U Material SUS3...

Page 6: ...ear Item Number SR FFLASH2 0 ADJUSTABLE S FLASHING Material Aluminum AL 1000 Series Finish Mill Clear Item Number SR SFLASH2 0 SOLASEAL Material Polyether Finish n a Item Number SRSFBASE 3 8 HEX BOLT...

Page 7: ...t o A c h i e v e S p e c i e d F i r e C l a s s R a t i n g S y s t e m F i r e C l a s s i c a t i o n A T y p e 1 2 L o w a n d S t e e p S l o p e S e e I n s t a l l a t i o n M a n u a l f o r...

Page 8: ...ar module Some solar module manufacturers may have speci c requirements rail placement that di ers from these instructions please check with your module manufacture for compliance regarding mounting r...

Page 9: ...AWG Copper Wire SolaRack Rail ECO STRD HD Under Module Grounding Mid Clamp Under Module Grounding End Clamp ILSCO SGB 4 Ground Lug IGB SR MICRO Micro attachment Bolt ECO STRD HD Grounding Splice Kit...

Page 10: ...r CTxxxYZZ AA where Y can be M or P ZZ can be 00 01 10 or 11 and AA can be 01 02 or 03 EcoSolargy Modules with 35 40mm frames and model identi er ECOxxxYzzA bbD where Y can be A H S or T zz can be 125...

Page 11: ...frames and model identi er MSExxxZZaa where ZZ can be MM SE SO or SQ and aa can be 1J 4J 4S 5K 5T 6J 6S or 6W Mitsubishi Modules with 46mm frames and model identi er PV MYYxxxZZ where YY is LE or JE a...

Page 12: ...er Ab xxx YY and standard G3 or InvisiMount G5 46mm frame where A is either E P or X b can be 17 18 19 20 21 or 22 and YY can be blank NE BLK COM C AC D AC BLK C AC or BLK D AC Sunspark Modules with...

Page 13: ...also listed under UL 2703 Fig 4 SolaRack does not require jumpers Periodic inspection is required Re inspect installation for loose components loose fasteners and any corrosion such that if found the...

Page 14: ...16 x 3 SUS304 Lag Screw Roo ng Surface Solar Module Frame SolaRack s T Bolt Comp Flashing UMG End Clamp Under Module Grounding Nut Aluminum Base Aluminum Top Grounding Bolt UMG Mid Clamp Grounding Bo...

Page 15: ...degrees Performance Not Limited to De ection Adequacy of Attachments Based on Evaluation Report Page 14 This photovoltaic system is to be installed in accordance with the National Electrical Code ANSI...

Page 16: ...ww solarackusa com Page 15 12 x 9 Aluminum Flashing AL1070 SUS304 T Bolt and Nut UV Rated Silicon Washer 5 16 x 3 SUS Lag Screw Water De ector SolaRack Flashing Water De lector 2018 SOLARACK INC VR2 1...

Page 17: ...ols Required Cordless Impact for lag screw only Torque Wrench Circular Saw with aluminum blade to cut rail edge 11mm Hex Socket for ILSCO SGB 4 13mm Hex Socket 1 4 Wood Drill Bit Work Gloves Safety Go...

Page 18: ...lot hole with sealant Roof Penetrations Roof Rafter The SolaRack Com kit is designed to be installed on asphalt or composite shingles roofs This system has been listed by ETL and conforms to UL STD 27...

Page 19: ...own slope shingles or a gap in shingle material Place the V water de ection below the next shingle DO NOT cover it Place the L foot and the Silicon Washer over the ashing and align the L Foot hole wit...

Page 20: ...nsert SolaRack Integrated Grounding Splice Kit at the rail opening Splice bar must be installed 50 set in each rail segment Use the Integrated Grounding Bonding splice kit at all connections between t...

Page 21: ...Stainless Steel Flung bolt will remove the anodization coating from the module frame for bonding while the grounding nut penetrates the bottom portion of the module frame Page 20 Step 7 Insert SolaRac...

Page 22: ...er Module Location of End clamps should comply with module manufacture guidelines Torque to 8 ft lb Page 21 Step 9 Install ILSCO SGB 4 Grounding Lug at the end of a rail please refer to Grounding Diag...

Page 23: ...it into the upper opening of the rail x Micro Attachment Installing Micro Inverters Optimizers Page 22 Step 2 Slide The Micro Inverter Optimizer into place make sure the washer is on top of the Micro...

Page 24: ...www solarackusa com Step 3 Tighte the Micro Bolt to secure the Micro Inverter Optimizer in place Torque to 20 ft lb Optimizer Solaredge Page 23 2018 SOLARACK INC VR2 1...

Page 25: ...esigned for SolaRack Inc SolaRack warrants to the buyer Buyer at the original installation site product shall be free from defects in material and workmanship which substantially impair their ability...

Reviews: