Step 4
Insert SolaRack® T-Bolt through
the L-Foot opening into the rail
opening. Torque 18.5 ft lb
Step 5
Insert SolaRack® Integrated Grounding
Splice Kit at the rail opening. Splice bar must
be installed 50% set in each rail segment.
Use the Integrated Grounding & Bonding
splice kit at all connections between two
rails. Maximum distance from L-Foot is no more
then 36” from each side of the Splice Kit
Torque to 10 ft lb.