Solar Stik Li Expander Pak 2400 Quick Start Manual Download Page 8

Solar Stik

® 

Technical Bulletin 2

Effective Date 20150831

800.793.4364

[email protected]

www.solarstik.com

© 2019 Solar Stik Inc. 

All Rights Reserved. Solar Stik is a registered trademark of Solar Stik Inc.

SS20190717

Item #

Item to be

Inspected

Interval 

at

91-140 

ºF 

(33-60 

ºC)

Storage 

Temp

Interval at

77-90 ºF

(< 25-32 ºC)

Storage 

Temp

Procedures

Non-mission 

Capable

4

In-storage 

maintenance 

charging

Q

S

3

1.  Charge Li Expander Paks 

for 24 hours at 29.0 V. 

Follow the instructions for 

the lithium battery charger 

used. 

2.  Charge until the Battery 

Status LED on all Li 

Expander Paks is flashing 

green (if flashing red to 

begin with). 

3.  If the Battery Status LED 

flashes red on any Li 

Expander Pak after 24 

hours, continue charging 

all Li Expander Paks for 

another 24 hours.

~If any Li Expander 

Pak has a red-flash 

Battery Status LED 

after 48 hours of 

charging OR if the 

LED emits no light 

after charging, 

contact Solar Stik 

Technical Support.

Continued from previous page

Page 8 of 8

Summary of Contents for Li Expander Pak 2400

Page 1: ...omenon common to all rechargeable batteries This Technical Bulletin provides easy instructions to ensure that the Li Expander Pak 2400s function optimally in all environments Conversely failure to fol...

Page 2: ...f steps that will allow simultaneous charging of all ten 10 batteries of a single system using shore power or generators as the charging source The basic system charging connection scheme is shown in...

Page 3: ...Port accessible Figure 3 50 A to 30 A Adapter Cable Figure 4 30 A to 15 A Adapter Cable Figure 5 Adaptor Cables attached to the AC input connection on the PRO Verter 7000 3 Connect the 30 A and or 15...

Page 4: ...ble for each as shown in the diagram above 5 Connect the two 2 Inter Connect Strips to the 24VDC IN ports on the front left side of the PRO Verter 7000 using two 2 5 Inter Connect cables as shown in t...

Page 5: ...s indicator will be GREEN NOTICE Extending the charge times beyond the minimum will not result in damage to the Li Expander Pak 2400s However they should not be left to charge indefinitely Minimum cha...

Page 6: ...charging more frequently and maintaining the Expander Paks in a fully charged state increases as the storage temperature increases The higher the storage temperature the faster the Li Expander Pak 240...

Page 7: ...from the exterior and ports 3 Close all unused port covers If the case is broken or split or if ports are damaged contact Solar Stik Technical Support for advice on how to proceed 2 Expander Pak Stat...

Page 8: ...harging Q S3 1 Charge Li Expander Paks for 24 hours at 29 0 V Follow the instructions for the lithium battery charger used 2 Charge until the Battery Status LED on all Li Expander Paks is flashing gre...

Reviews: