
|
33
June 2020
|
Solar Stik
®
, Inc.
24VDC PRO-Verter 5000-120 AGS Operator Manual
OPERATOR INSTRUCTIONS
Power Up PRO-Verter
Figure 18. Powering up the PRO-Verter
Figure 19. Setting the PRO-Verter clock
The LCD screen will automatically display the “Set Clock” screen after it has been turned on. The
series of pictures in Figure 19 shows what the operator will see at each stage of the process. Follow
the steps in order.
Set Clock
Rotate the dial until desired
hour appears. Press down
SELECT knob to set hour.
Rotate the dial until desired
minute appears. Press down
SELECT knob to set minute.
Rotate the dial until desired
AM or PM appears. Press
down SELECT knob to set
AM or PM.
For normal, sustained operation, the PRO-Verter must be connected to a 24 VDC power source
(such as 24VDC Li Expander Paks) to power up. When the PRO-Verter powers up, the master
control board that commands the various internal circuits performs an internal diagnostic check to
ensure their functions can be safely used. While this is occurring, the LCD at the keypad will flash
revision information for all of the control boards that are installed.
24 VDC
Power Source/
Batteries
Toggle Power
Switch to ON
120 VAC
Power Source