Pole Preparation and Installation
Four holes must be drilled at the top of the pole. This should be done before the pole is set and anchored.
Drill two equally-spaced 0.125-inch (3.2 mm) pilot holes 1 inch (2.5 cm) below the top of the pole, as shown
in Figure 3. Drill two additional equally-spaced 0.125-inch (3.2 mm) pilot holes 4 inches (10.2 cm) below the
top of the pole, as shown in Figure 3. Position the holes 90 degrees from the holes drilled in previous step.
FIGURE 3
DRILLING 4 HOLES AT TOP OF POLE
FIGURE 4
ROUTING LUMINAIRE LOAD CABLE
Routing Luminaire Load Cable Through Arm Assembly
Insert the male end of the luminaire load cable (with cord grip in plastic bag) into the fixture end of the arm. Slide the
luminaire load cable through the arm assembly until the connector plug emerges from pipe end of the arm assembly,
opposite side of luminaire install holes (Figure 4).
FIGURE 5
ATTACHING PV ASSEMBLY TO PV MODULE
Attaching the PV Module to the PV Mount
Lay the PV module upside down on a protected surface (cardboard shipping carton can be used) and
position the PV mount over the PV module so that the hole and grommet on the side of the pipe face the
PV module junction box. Route the PV cable in through the center hole and out through the side of the PV
mount. Fasten the PV mount to the PV module using the 4x bolts and washers provided (Figure 5).
Pole Anchoring
It is imperative that the pole is properly anchored.
Standard pole anchoring methods may be used,
providing they meet the engineering requirements
for EPA and weight of the system you have
purchased.
Holes for Luminaire install
must face DOWN
Junction Box
Hole & Grommet
MC Connectors
to PV Module
PV Module Cable