![Sol GreenWay GRNWY-125 Installation And Owner'S Manual Download Page 14](http://html.mh-extra.com/html/sol/greenway-grnwy-125/greenway-grnwy-125_installation-and-owners-manual_1312773014.webp)
14 GreenWay™ installation & operation manual 0410 MKTG-IM-GREEN-002
Battery Replacement
1. Remove the battery box cover.
2. At the controller, disconnect the solar array harness connector, then disconnect the single aiSUN™
harness from the battery harness.
3. Remove the battery from the battery box.
4. Disconnect the battery harness from the old battery and attach to the new battery.
5. Place the new battery in the battery box.
6. At the controller, connect the aiSUN™ single harness to the battery harness, then connect the solar array
harness.
7. Replace the battery box cover.
Caution: When disconnecting the cables, be sure to disconnect the solar array harness first.
Caution: When reconnecting the cables, be sure to connect the aiSUN™ single harness from
the battery first. Then connect the pv array harness.