
- 13 -
Therefore point B is 0.511m higher than point A. (The
value of h will be negative if point B is lower than point A.)
<When the distance between points A and B is large or if
the height difference is great>
1) Divide the distance into a number of sections and deter-
mine the height difference of each section.
Fig.6.2
2) The height difference between points A and B is the total
of the height differences of all the sections.
The general formula is:
Altitude of the required point = altitude of known point + total
of backsight values - total of foresight values.
※
This simple leveling technique has no error check. It is
better to measure from A to B and back to A so that the
error of closure can be calculated.
Summary of Contents for B20
Page 1: ...SURVEYING INSTRUMENTS B20 B21 自動レベル Automatic Level 取扱説明書 OPERATOR S MANUAL ...
Page 2: ...This is the mark of the Japan Surveying Instruments Manufacturers Association ...
Page 56: ... 26 MEMO ...
Page 57: ... 27 MEMO ...
Page 58: ... 28 MEMO ...
Page 59: ......
Page 60: ...第 4 版 07 0910 2004 株式会社ソキア トプコン 4th ed 07 0910 2004 SOKKIA TOPCON LTD ...