13
Parts required for this step / Pièces requises pour cette étape :
ASSEMBLY
ASSEMBLAGE
© Sojag inc. 2016
Step 4
4.1 Attach the wheels (B5) and the bar cover
wheel (B7) to the door (B1) usign the screws
and cap nut (B6) as illustrated.
Étape 4
4.1 Attacher les roulettes (B5) et la barre couvre
roulette (B7) à la porte (B1) à l’aide des vis et
écrou-borgnes (B6) tel qu’illustré.
B5
X
4
B6
X
8
B7
X
2
X
2
Summary of Contents for Four Seasons Sunshelter E442-6159318
Page 16: ...16 Sojag inc 2016 X2 A2 V C B2 X4 X2 Use screw V2 V2 G ...
Page 23: ...23 Sojag inc 2016 ZL2 ZL2 ZL2 ZL2 ZL3 ZL3 ZL3 ZL3 S ZL2 V J X8 ZL2 ZL2 ZL3 ZL3 ...
Page 25: ...25 Sojag inc 2016 S X4 ZL1 ZL1 ZL1 ...
Page 27: ...K J V1 K J Y 27 Sojag inc 2016 or ou ...
Page 37: ...37 Sojag inc 2016 R1 ...
Page 38: ...Printed in China Imprimé en Chine www sojag ca ...