
Chapter 6 - Connection to PROFIBUS
PROFIBUS Tester BC-700-PB - User Manual
25
Shut down complete installation before connecting
Shut down the PLC and all the devices connected to the PROFIBUS as all
these simple connection types will divide the bus.
Use D-sub adapter cable BC-600-PB-CB-DSUB-1 for testing on live
systems
For testing on live systems we highly recommend using the optional D-sub
adapter cable BC-600-PB-CB-DSUB-1 with reduced influence on bus
operation.
6.3.1
Connection via D-sub connector with service socket
If all bus stations provide D-sub connectors with an additional service socket, you can
simply plug in the PROFIBUS Tester 5 at that socket:
Figure 19: Connection points for the D-sub adapter cable