Sofar solar 30KTLX-G3 User Manual Download Page 1

S h e n z h e n

 

S O FA R S O L A R

 

C o . ,

 

L t d .

Solar Grid-tied Inverter

Product Model

SOFAR

 

25~50KTLX-G3

User manual

Summary of Contents for 30KTLX-G3

Page 1: ...Shenzhen SOFARSOLAR Co Ltd Solar Grid tied Inverter Product Model SOFAR 25 50KTLX G3 User manual ...

Page 2: ...3 6 Installation 22 4 Electrical Connection 24 4 1 Electrical Connection 25 4 2 Grounding Connection PE 25 4 3 Connect grid side of inverter AC Output 27 4 4 Connect PV side of inverter DC Input 30 4 5 Communication Connection 33 5 Commissioning of inverter 44 5 1 Cable Connection Inspection 44 5 2 Start Inverter 44 5 3 Shutdown inverter 45 5 4 Setting power quality response modes 45 6 Operation i...

Page 3: ...erates the device at any time must operate in accordance with the requirements of this manual Copyright Declaration The copyright of this manual belongs to Shenzhen SOFARSOLAR Co Ltd Any corporation or individual should not plagiarize partially cope or fully copy including software etc not allow to duplication and publishment in any form and any way All rights reserved SOFARSOLAR reserves the righ...

Page 4: ...ks described in this manual only can be performed by qualified electricians Symbols Used The following types of safety instruction and general information appear in this document as described below Danger indicates a hazardous situation which if not avoided will result in death or serious injury Danger Warning indicates a hazardous situation which if not avoided could result in death or serious in...

Page 5: ... conform with laws regulations codes and standards applicable in the jurisdiction Before installing and adjusting the produce please read all of instructions cautions and warnings in this manual Before connecting the product to the electrical utility grid contact the local utility company for allowance Also this connection must be made only by qualified electrician If the failure persists please c...

Page 6: ...el attach the side of product which contact important information and technical data the type label must permanent attached to the product SOFAR 25 50KTLX G3 has warming symbol attached the product which contact information of safety operation The warming symbol must permanent attached to the product Installation location requirement Please install the inverter according to the following section P...

Page 7: ...inverter Before the electrical connection use opaque material to cover the PV modules or disconnect PV string DC switch PV arrays will produce dangerous voltage if it is exposure under sun Danger All operation must accomplish by certified electrical engineer Must be trained Completely read the manual operation and understand all information Warming Must get permission by local utility company befo...

Page 8: ...ectromagnetic environment without any trouble or error and impose no unacceptable effect upon the environment Therefore EMC represents the quality characters of an electrical equipment The inherent noise immune character immunity to internal electrical noise External noise immunity immunity to electromagnetic noise of external system Noise emission level influence of electromagnetic emission upon ...

Page 9: ...voltage in the inverter After disconnect with the DC side there is a residual voltage in the inverter operator should wait for 5 minutes to ensure the capacitor is completely discharged Caution of high voltage and electric shock The products operates at high voltages Prior to performing any work on the product disconnect the product from voltage sources All work on the product must be carried out ...

Page 10: ...ntation supplied with the product before install Positive pole and negative pole Positive pole and negative pole of the input voltage DC Temperature Indicated the temperature allowance range RCM logo RCM Regulatory Compliance Mark The product complies with the requirements of the applicable Australian standards ...

Page 11: ... 50KTLX G3 is a transformer less on grid PV inverter that converters the direct current of the PV panels to the grid compliant three phase current and feeds into the utility grid Figure 2 1PV Grid Tied System SOFAR 25 50KTLX G3 may only be operated with PV arrays photovoltaic module and cabling for on grid condition Do not use this product for any other or additional purposes Any damage or propert...

Page 12: ...tage between neutral and earth should be less than 30V inverters are compatible with TN S TN C TN C S TT IT grid Figure2 2 Overview of the grid configurations Product Dimensions The choice of optional parts of inverter should be made by a qualified technician who knows the installation conditions clearly Dimensions Description SOFAR 25KTLX G3 30KTLX G3 30KTLX G3 A 33KTLX G3 36KTLX G3 40KTLX G3 45K...

Page 13: ...de and back of the machine take 50KW for example Figure 2 4Bottom view take 50KW for example Note 25 36K and 40K HV supports 6 channel PV string input 40 50K and 50K HV supports 8 channel PV string input 403 0 176 0 126 0 126 0 80 0 4 12 0 8 10 0 36 0 10 0 2 7 0 Figure 2 5 bracket dimensions take 50KW for example ...

Page 14: ...ation 2 Breather valve 6 COM Port for RS485 communication 3 DC positive poles connecters 7 AC output 4 DC negative poles connecters 8 Fans Figure 2 6Bottom view of the SOFAR 25 50KTLX G3 Labels on the equipment Note label must NOT be hidden with objects and extraneous parts rags boxes equipment etc theymust be cleaned regularly and kept visible at all times Figure 2 7 Product label ...

Page 15: ...nts Function Module A Energy management unit Remote control to start shunt down inverter through an external control B Feeding reactive power into the grid The inverter is able to produce reactive power thus to feed it into the grid through the setting of the phase shift factor Feed in management can be controlled directly by APP or through a RS485 interface C Limited the active power fed into gri...

Page 16: ...User manual Copyright Shenzhen SOFARSOLAR Co Ltd 12 2 3 Electrical block diagram Figure 2 8 Schematic diagram take 50KW for example 2 4 Efficiency and derating curve Figure 2 9 Power efficiency curve take 50KW for example ...

Page 17: ...SOFAR 25 50KTLX G3 User manual Copyright Shenzhen SOFARSOLAR Co Ltd 13 Figure 2 10 Rated Power ratio vs Grid Voltage ...

Page 18: ...unt the product at a easy to reach location Caution Consider the weight of this product when doing transport and moving Choose an appropriate mounting position and surface At least two persons for installation Attention 3 1 Installation Process 3 2 Checking Before Installation Checking Outer Packing Materials Before unpacking please check the condition of the outer package materials if any damaged...

Page 19: ...r immediately if anything missing or damage Figure 3 1Components and mechanical parts that inside the package No Pictures Description Quantity 1 SOFAR 25 50KTLX G3 1 PCS 2 Rear Panel 1 PCS 3 AC waterproof cover 1 PCS 4 M8 80 Hexagon screws 4 PCS 5 PV metal pin 25 36KTLX G3 6PCS 40 50KTLX G3 8PCS 40KTLX G3 HV 6PCS 50KTLX G3 HV 8PCS 6 PV metal pin 25 36KTLX G3 6PCS 40 50KTLX G3 8PCS 40KTLX G3 HV 6PC...

Page 20: ...0 50KTLC G3 8PCS 40KTLC G3 HV 6PCS 50KTLC G3 HV 8PCS 8 PV input connector 25 36KTLC G3 6PCS 40 50KTLC G3 8PCS 40KTLC G3 HV 6PCS 50KTLC G3 HV 8PCS 9 M4 cross screw For locking the waterproof cover 6PCS 10 M5 cross screw For locking the rear panel 1PCS 11 M6 Hexagon screws 1PCS 12 Manual 1PCS 13 Warranty Card 1PCS ...

Page 21: ...nal Connect PE 1PCS 16 R type terminal Connect L1 L2 L3 N 4PCS 17 AC terminal insulation partition 4PCS 18 Or Communication Terminal 1PCS 19 USB acquisition stick WIFI Ethernet 1 PCS Optional 3 3 Tools Prepare tools required for installation and electrical connection as following table Figure 3 2 Installation tools ...

Page 22: ... when installing AC power cable Use to remove AC connectors from the product 3 Socket wrench Fasten the cable and Install the expansion bolt 4 Hammer Install the expansion bolt 5 Removal Tool Remove PV Connector 6 Wire Stripper Used to peel cable 7 M6 hexagon wrench M6 use to uninstall and install the front top cover and down cover 8 Crimping Tool Use to crimp cable on grid side load side and CT e...

Page 23: ... Installer wear when installing product 14 Safety goggles Installer wear when installing product 15 Mask Installer wear when installing product 3 4 Determining the Installation Position Select an appropriate location to install the product to make sure the inverter can work in a high efficiency condition When selecting a location for the inverter consider the following Note install vertical or bac...

Page 24: ...SOFAR 25 50KTLX G3 User manual Copyright Shenzhen SOFARSOLAR Co Ltd 20 Figure 3 1Installation Position Selection Figure 3 2Clearance for single inverter ...

Page 25: ...000mm 200mm Figure 3 3 Clearance for multiple inverters 3 5 Moving of inverter Unload the inverter from package horizontally move to the install position When open the package at least two operators insert the hands to the back of heat sink part Figure 3 4 Move inverter from package 1 ...

Page 26: ...e inverter on the floor put it above foam or paper to avoid the damage of the shell of inverter Attention 3 6 Installation Step 1 Placed the rear panel on the mounting wall determine the mounting height of the bracket and mark the mounting poles accordingly Drilling holes by using Hammer Drill keep the hammer drill perpendicular to the wall and make sure the position of the holes should be suitabl...

Page 27: ...l Copyright Shenzhen SOFARSOLAR Co Ltd 23 Figure 3 6 Installation instruction 1 Step 4 Lift the inverter and hang it on the rear panel and fixing both side of inverter with M6 screw accessories Figure 3 7 Installation instruction 2 ...

Page 28: ...reaker is OFF Waiting 5 minutes for the capacitor to be electrically discharged Installation and maintenance should be done by certified electrical engineer Attention Before the electrical connection use opaque material to cover the PV modules or disconnect PV string DC switch PV arrays will produce dangerous voltage if it is exposure under sun Danger For this product the open circuit voltage of P...

Page 29: ...g electrode usingground cable SOFAR 25 50KTLX G3 is a transformerless inverter which requires the positive pole and negative pole of the PV array are NOT grounded Otherwise it will cause inverter failure In the PV system all non current carrying metal parts such as mounting frame combiner box enclosure etc should be connected to earthed Note Preparation prepare the grounding cable recommend greate...

Page 30: ... terminal OT M6 Figure 4 3 Grounding connection instruction 2 Note 1 L3 is the length between the insulation layer of the ground cable and crimped part L4 is the distance between the crimped part and core wires protruding from the crimped part Note 2 The cavity formed after crimping the conductor crimp strip shall wrap the core wires completely The core wires shall contact the terminal closely Ste...

Page 31: ...cuit breaker Caution Item Model L N Cross section area of Cu or Al cable mm2 PE Cross section area of Cu or Al cable mm2 Muti core outdoor cable diameter mm AC Circuit Breaker specification SOFAR 25KTLX G3 16 35 16 50 63A 230V 3P I N 0 1A SOFAR 30KTLX G3 16 35 16 50 63A 230V 3P I N 0 1A SOFAR 30KTLX G3 A 16 35 16 50 63A 230V 3P I N 0 1A SOFAR 33KTLX G3 16 35 16 50 80A 230V 3P I N 0 1A SOFAR 36KTLX...

Page 32: ...in selecting an external RCD to avoid nuisance tripping 1 Selecting appropriate RCD 2 Configure the trip current of inverter internal RCD to a lower value that the trip current of the external RCD Figure 4 5 Incorrect connection between load and inverter The resistance at connection point must less than 2Ω In case to have a properly anti islanding function please choose the high quality PV cable a...

Page 33: ... high current 5 core terminal block and customized AC output waterproof cover which can meet the IP65 level requirements after installation AC cable need customer self connect Figure 4 7Theequipment Multi core Cable Wiring Procedure as following Step 1 Select the appropriate cable diameter according to table 4 1 process the cable according to the following picture size requirements and then pass t...

Page 34: ...e cable to the AC terminal block L1 L2 L3 N PE contacts and tighten the M8 screws 6 10 N m and M6 screws 5 7 N m with a sleeve Install AC shield screws 2 3 N m Figure 4 9 AC cable connection instruction diagram 2 Note Copper aluminum conversion terminal is required when aluminum wire is used which is delivered with the copper terminal 4 4 Connect PV side of inverter DC Input Table 4 2 recommend DC...

Page 35: ...ag connect the cable according below diagram 1 Positive cable 2 negative cable Figure 4 10 DC cable connection 1 Step 2 Crimp the PV metal contact pin to the striped cable using a proper crimping pliers Figure 4 11 DC cable connection 2 Step 3 Insert wire into the connector cap nut and assemble into the back of male or female plug When you heard a click the pin tact assembly is seated correctly 3 ...

Page 36: ...indicated connection succeed Figure 4 13 DC cable connection 4 Figure 4 14 Use a multimeter to check the positive and negative electrodes Note Please use multimeter to make sure the PV array positive pole and negative pole Dealing If need to remove the PV connector from inverter side please use the Removal Tool as below diagram move the connector gently Before moving the positive and negative conn...

Page 37: ...r wiring in case the signal be affected Note SOFAR 25 50KTLX G3 inverter has one USB Port and one COM Port as shown in the following figure 2 1 1 USB Port 2 COM Port Figure 4 16 Communication connection Port 4 5 1 USB Port Port Description USB port USB flash disk access Use for updating the software USB acquisition stick WIFI or Ethernet access Use for remote data acquisition and upgrading of inve...

Page 38: ...pair meets local standards 2 or 3core 4 8 0 25 1 Port Description PIN Define Function Note 1 RS485A RS485 signal Wire connection monitoring or multiple inverter monitoring 2 RS485A RS485 signal 3 RS485B RS485 signal 4 RS485B RS485 signal 5 Electric meter RS485A Electric meter RS485 signal Wire connection Electric meter 6 Electric meter RS485B Electric meter RS485 signal 7 GND S Communication groun...

Page 39: ...0KTLX G3 User manual Copyright Shenzhen SOFARSOLAR Co Ltd 35 10 DRM2 6 11 DRM3 7 12 DRM4 8 13 16 Blank PIN N A N A Procedure Subject to the real object Procedure Corresponding to the second communication terminal ...

Page 40: ...n 2 s The inverter will continue to respond while the mode remains asserted Pin NO Function 9 DRM1 5 10 DRM2 6 11 DRM3 7 12 DRM4 8 7 GND 8 DRM0 Table 5 4 Function description of the DRMs terminal NOTE Supported DRM command DRM0 DRM5 DRM6 DRM7 DRM8 b Logic interface for VDE AR N 4105 2018 11 is in order to control and or limit the inverter s output power The inverter can be connected to a RRCR Radi...

Page 41: ...11 L3 Relay contact 3 input K3 Relay 3 output 12 L4 Relay contact 4 input K4 Relay 4 output 7 G GND Relays common node Table 5 5 Function description of the terminal Relay status close is 1 open is 0 L1 L2 L3 L4 Active Power Cos φ 1 0 0 0 0 1 0 1 0 0 30 1 0 0 1 0 60 1 0 0 0 1 100 1 Table 5 6 4 port RRCR power levels c Logic interface for EN50549 1 2019 is in order to cease active power output with...

Page 42: ...ise to fasten it securely Meter CT PIN5 and PIN6 are used for meter communication the electricity meter is shown in the fig PIN5 and PIN6 correspond to 24 25 respectively on the electricity meter as shown in fig The connection mode is shown in fig In position 2 5 8 10 were respectively connect wires with corresponding inverter R S and T phase and zero line is linked together the second will be con...

Page 43: ...er Contact manufacturer importer distributor to order CT and Meter To obtain grid information via Plan A Wiring according to the wiring method as shown in Figure 5 20 and enable Anti Reflux Power function and set the Reflux Power limit on the menu interface of the machine Refer to 7 3 Main interface in this manual for specific operation methods The setting of hard anti reverse flow is the same as ...

Page 44: ...ard Anti Reflux power limit If the Anti reflux power exceeds the Hard Anti Reflux power limit the limit value is reported to trigger the overload protection When communication signal with the electricity meter is lost the output apprent power of the inverter is limited to the value of soft export limit and does not trigger fault protection When Hard anti reflux control is enabled a loss of communi...

Page 45: ...er of the two RS485 ports Figure 4 18 A single SOFAR 25 50KTLX G3 connecting communications If multiple SOFAR 25 50KTLX G3 are used connect all SOFAR 25 50KTLX G3 in daisy chain mode over the RS485 communication cable Set different Modbus address 1 31 for each inverter in LCD display Figure 4 19 Multi SOFAR 25 50KTLX G3 connecting Communications Register remote monitoring of SOFAR 25 50KTLX G3 at ...

Page 46: ...doc solarmanpv com web 7 SolarMAN App User Manual Please visit the https doc solarmanpv com web 14 WIFI Ethernet By the USB acquisition stick WIFI Ethernet transfer the inverter power output information alarm information operation state to the PC terminal or local data acquisition device then uploaded to the server Register remote monitoring of SOFAR 25 50KTLX G3 at its relevant website or APP acc...

Page 47: ...version to wireless router The length of the RS485 communication cable should be less than 1000 m The length of the WIFI communication cable should be less than 100 m If multiple SOFAR 25 50KTLX G3 are connected to the monitoring device over an RS485 USB converter a maximum of 31 inverters can be connected in a daisy chain Note ...

Page 48: ...than the inverter max DC input 5 2 Start Inverter Step 1 Turn ON the DC switch Step 2 Turn ON the AC circuit breaker When the DC power generated by the solar array is enough the SOFAR 25 50KTLX G3 inverter will start automatically Screen showing normal indicates correct operation NOTE 1 Choose the correct country code refer to section 6 3 of this manual NOTE 2 Different distribution network operat...

Page 49: ...ngs will be locked end customers cannot modify by themselves These setting require professional and technical personnel to conduct them by issuing and transmitting instructions on the remote monitoring platform on the premise that the data acquisition rod is installed WiFi GPRS Ethernet And the account must be authorized by SOFARSOLAR Power quality settings can be set view changed by logging onto ...

Page 50: ...el Buttons and Indicator lights Button Short press UP button go up Long press UP button exit menu or current interface v Short press DOWN button go down v Long press DOWN button enter menu or current interface Indicator Lights GFI Red light ON GFCI faulty Normal Green light flashing counting down or checking Normal Green light ON Normal Alarm Red light ON recoverable or unrecoverable faulty Up but...

Page 51: ...urrent and frequency today generation total generation Inverter working status PV 1 input voltage and current Inverter working status PV 2 input voltage and current Inverter working status PV 3 input voltage and current Inverter working status PV 4 input voltage and current Inverter working status PV generated power Inverter working status today generated electricity Inverter working status total ...

Page 52: ...atus grid voltage and current Inverter working status grid voltage and frequency Inverter working status USB status Inverter faulty alarm When control board successfully connected with communication board the LCD display the current state of the inverter display as shown in the figure below ...

Page 53: ...nverter will go to Fault State or Permanent State if any error or fault occurs Normal Inverter enter to Normal State it is feeding power to the grid inverter will go to Fault State or Permanent state if any error or fault occurs Fault Fault State Inverter has encountered recoverable error It should recover if the errors disappear If Fault State continues please check the inverter according error c...

Page 54: ... the button to Enter the main interface of 1 Enter Setting and long press to enter the setting menu You can select the content you want to set by short pressing the button Note1 Some settings need to enter the password the default password is 0001 when entering the password short press to change the number long press to confirm the current number and long press after entering the correct password ...

Page 55: ...W 025 000 India 002 Germany VDE0126 026 000 Philippines 001 000 Italia CEI 021 Internal 027 000 New Zealand 001 Italia CEI 016 Italia 028 000 Brazil 002 Italia CEI 021 External 001 Brazil LV 003 Italia CEI0 21 In Areti 002 Brazil 230 002 000 Australia A 003 Brazil 254 008 Australia B 029 000 Slovakia VSD 009 Australia C 001 Slovakia SSE 003 000 Spain RD1699 002 Slovakia ZSD 004 000 Turkey 033 000 ...

Page 56: ...n settings will be reset to their default values for Australia Region A B C respectively Default grid settings for different regions are shown in the following table Protective function Protective function limit Trip delay time Maximum disconnection time Undervoltage 2 V 70V 1s 2s Undervoltage 1 V 180V 10s 11s Overvoltage 1 V 265V 1s 2s Overvoltage 2 V 275V 0 2s Region Australia A Australia B Aust...

Page 57: ...ter reactive output Q of Srated 44 supplying 0 0 60 sinking Australia B Voltage 205 220 235 255 Inverter reactive output Q of Srated 30 supplying 0 0 40 sinking Australia C Voltage 215 230 240 255 Inverter reactive output Q of Srated 44 supplying 0 0 60 sinking 5 On Off Control Inverter on off local control 6 Set Energy Set the total power generation You can modify the total power generation throu...

Page 58: ... the allowable export power Disable Hard Anti Reflux Control OK Enable OK KW Input the allowable export power Disable Press Up or Down to change the value of the first digit Press OK to switch to second digit Press Up or Down to change the value of the second digit After inputting all digit press OK to confirm Note When enabling the Hard Anti Reflux Control and Anti Reflux Control at the same time...

Page 59: ...eter instruction in this manual for specific operation methods 14 Reflux Mode The function is divided into three options CTR Totalpower CTR Phasepower and CTR SellingPower the first one is the default usage for SOFAR 25 50KTLX G3 Refer to 7 5 Smart meter usage in this manual for specific operation methods 15 Autotest Fast 15 Autotest Fast OK Start Autotest Long press the to start Testing 59 S1 Wai...

Page 60: ...t press the 59 S1 228V 902ms Short press the 59 S2 threshold 264 5V 200ms Short press the 59 S2 229V 204ms Short press the 27 S1 threshold 195 5V 1500ms Short press the 27 S1 228V 1508ms Short press the 27 S2 threshold 34 5V 200ms Short press the 27 S2 227V 205ms Short press the 81 S1 threshold 50 5Hz 100ms Short press the 81 S1 49 9Hz 103ms Short press the 81 S2 threshold 51 5Hz 100ms Short press...

Page 61: ...ecific ID No and happening time User can enter Event List interface through main interface to check details of real time event records Event will be listed by the happening time and recent events will be listed in the front Please refer to below picture Long press the button and short press the button to turn the page in standard interface then enter into 2 Event List interface 2 Event List 1 Curr...

Page 62: ...play the current system time C Software Update User can update software by USB flash disk SOFARSOLAR will provide the new update software called firmware for user if it is necessary the user needs to copy the upgrade file to the USB flash disk 6 4 Updating Inverter Software SOFAR 25 50KTLX G3 inverter offer software upgrade via USB flash drive to maximizeinverter performance and avoid inverter ope...

Page 63: ...ress DOWN button to enter the menu then short press DOWN button to find 5 SoftwareUpdate in the LCD display long press DOWN button to enter input password interface Step 7 Input the password if password is correct and then begin the update process Step 8 System update main DSP slave DSP and ARM in turns If main DSP update success the LCD will display Update DSP1 Success otherwise display Update DS...

Page 64: ...display 14 Reflux Mode In the Anti Reflux Mode 14 Reflux Mode interface select one of the CTR Totalpower CTR Phasepower or CTR SellingPower by press DOWN button success will be displayed if setting successfully Step 2 In the standard interface Long press DOWN button to enter the 1 Enter Setting interface and then Short press DOWN button to enter the 10 Set AntiReflux interface long press DOWN butt...

Page 65: ...nt The set Reflux power CTR SellingPower The selling power of any phase of the system connection point The set Reflux power 3 Selling electricity sending electricity to the grid Buy electricity take energy from the grid Anti Reflux limit the energy sent to the grid Positive power the power purchased Negative power the power of selling electricity ...

Page 66: ...This section contains the potential errors resolution steps and provide users with troubleshooting methods and tips The process to check the event list can refers to Manual Chapter 7 3 B List7 1 Even list Code Name Description Solution ID001 GridOVP The grid voltage is too high If the alarm occurs occasionally the possible cause is that the electric grid is abnormal occasionally Inverter will auto...

Page 67: ...otection points after obtaining approval from the local electrical grid operator ID007 LVRT fault LVRT function is faulty ID008 IslandFault Island protection error ID009 GridOVPInstant1 Transient overvoltage of grid voltage 1 ID010 GridOVPInstant2 Transient overvoltage of grid voltage 2 ID011 VGridLineFault Power grid line voltage error ID013 RefluxFault Anti Reflux function is faulty ID017 HwADFa...

Page 68: ...ult_HeatS ink1 Radiator 1 temperature protection ID057 TempFault_Env1 Ambient temperature 1 protection ID059 TempFault_Inv1 Module 1 temperature protection ID065 VbusRmsUnbalan ce Unbalanced bus voltage RMS Internal faults of inverter switch OFF inverter wait for 5 minutes then switch ON inverter Check whether the problem is solved If no please contact technical support ID066 VbusInstantUnbal ance...

Page 69: ...5 unrecoverIacUnb alance Permanent failure of unbalanced output current ID141 unrecoverVbusU nbalance Bus voltage unbalanced permanent failure ID142 PermSpdFail DC PV surge protection ID143 PermSpdFail AC Grid surge protection ID145 USBFault USB fault Check the USB port of the inverter ID146 WifiFault Wifi fault Check the Wifi port of the inverter ID147 BluetoothFault Bluetooth fault Check the blu...

Page 70: ...7 2 ID207 StrFuseALM8 1 StrFuseALM8 1 ID208 StrFuseALM8 2 StrFuseALM8 2 ID209 StrFuseALM9 1 StrFuseALM9 1 ID210 StrFuseALM9 2 StrFuseALM9 2 ID211 StrFuseALM10 1 StrFuseALM10 1 ID212 StrFuseALM10 2 StrFuseALM10 2 ID213 StrFuseALM11 1 StrFuseALM11 1 ID214 StrFuseALM11 2 StrFuseALM11 2 ID215 StrFuseALM12 1 StrFuseALM12 1 ID216 StrFuseALM12 2 StrFuseALM12 2 Note the above table is our general fault ID...

Page 71: ...nk for ventilation check the heat sink for blockage dust snow etc and clean them if they exist Please clean the heat sink with an air blower a dry soft cloth or a soft bristle brush Do NOT clean the heat sink with water corrosive chemicals detergent etc Fan cleaning For inverter SOFAR 25 50KTLX G3 with fans please check if inverter have abnormal sound when inverter is operating Check if fan on cra...

Page 72: ...late Step 3 Remove the screws at the fan position unplug the terminal at the fan and inverter interface and completely remove the fan Figure 7 2 remove the fan and protective cover Step 4 Use a soft brush to clean the fan If it is damaged please replace it in time Step 5 Re install the inverter according to the above steps ...

Page 73: ... of MPP trackers 3 3 3 3 3 Number for DC inputs 6 6 6 6 6 Max input voltage 1100V Start up voltage 200V Rated input voltage 620V 620V 620V 620V 620V MPPT operating voltage range 180V 1000V Full power MPPT voltage range 480 850V 480 850V 480 850V 510 850V 540 850V Max input MPPT current 3 40A 3 40A 3 40A 3 40A 3 40A Max input short circuit current per MPPT 3 50A 3 50A 3 50A 3 50A 3 50A Output AC Ra...

Page 74: ...0 100 THDi 3 Power factor 1 default adjustable 0 8 Efficiency Max efficiency 98 6 98 6 98 6 98 6 98 6 European weighted efficiency 98 2 98 2 98 2 98 2 98 2 Protection DC reverse polarity protection Yes Anti islanding protection Yes Leakage current protection Yes Ground fault monitoring Yes PV array string fault monitoring Yes Anti reverse power function Yes DC switch Yes AFCI protection Optional A...

Page 75: ... operating altitude 4000m Noise 60dB Weight 36kg Cooling Fan Dimension 585 480 220mm Display LCD Bluetooth APP Warranty 5 years Optional 7 years 10 years Standard EMC EN 61000 6 2 EN 61000 6 3 EN 61000 3 11 EN 61000 3 12 Safety standard IEC 62109 1 2 IEC 62116 IEC 61727 IEC 61683 IEC 60068 1 2 14 30 IEC 60255 Grid standard AS NZS 4777 VDE V 0124 100 V 0126 1 1 VDE AR N 4105 CEI 0 21 CEI 0 16 UNE 2...

Page 76: ...480 850V 510 850V 540 850V 620 850V 650 850V Max input MPPT current 4 40A 4 40A 4 40A 3 40A 4 40A Max input short circuit current per MPPT 4 50A 4 50A 4 50A 3 50A 4 50A Output AC Rated power 40000W 45000W 50000W 40000W 50000W Max AC power 44000VA 50000VA 55000VA 44000VA 55000VA Rated output current 58 0A 60 6A 65 2A 68 2A 72 5A 75 8A 48 1A 60 2A Max output current 66 7A 75 8A 83 3A 53A 66 2A Nomin...

Page 77: ...tection Yes Anti islanding protection Yes Leakage current protection Yes Ground fault monitoring Yes PV array string fault monitoring Yes Anti reverse power function Yes DC switch Yes AFCI protection Optional Anti PID function Optional Input output SPD PV type II standard AC type II standard Communication Communication RS485 USB Bluetooth Optional WiFi GPRS 4G PLC General Data Ambient temperature ...

Page 78: ...operating altitude 4000m Noise 60dB Weight 37kg Cooling Fan Dimension 585 480 220mm Display LCD Bluetooth APP Warranty 5 years Optional 7 years 10 years Standard EMC EN 61000 6 2 EN 61000 6 3 EN 61000 3 11 EN 61000 3 12 Safety standard IEC 62109 1 2 IEC 62116 IEC 61727 IEC 61683 IEC 60068 1 2 14 30 IEC 60255 Grid standard AS NZS 4777 VDE V 0124 100 V 0126 1 1 VDE AR N 4105 CEI 0 21 CEI 0 16 UNE 20...

Page 79: ...rter SN number of machines based on the first date of arrival Customers can apply to buy extended warranty products from the company s sales team by providing the product serial number our company may refuse to do not conform to the time limit extended warranty purchase application Customers can buy an extended warranty of 5 10 15 years If the customer wants to apply for the extended warranty serv...

Page 80: ... screen 5 Incorrect installation debugging and use methods 6 Failure to comply with safety regulations certification standards etc 7 Damage caused by improper storage by dealers or end users 8 Transportation damage including scratches caused by internal packaging during transportation Please claim directly from the transportation company or insurance company as soon as possible and obtain damage i...

Page 81: ...ADD 11 F Gaoxinqi Technology Building No 67 Area Xingdong Community Xin an Sub district Bao an District Shenzhen City China Email service sofarsolar com Tel 0510 6690 2300 Web www sofarsolar com ...

Reviews: