SOFAR 3K~6KTLM-G3
User manual
Copyright © Shenzhen SOFARSOLAR Co., Ltd
Contents
3.4. Determining the Installation Position..................................................- 15 -
3.5. Moving the SOFAR 3K~6KTLM-G3................................................. - 16 -
3.6. Installing SOFAR 3K~6KTLM-G3.................................................... - 17 -
4.2. Connecting PGND Cables...................................................................- 20 -
4.3. Connecting DC Input Power Cables................................................... - 22 -
4.4. Connecting AC Output Power Cables.................................................- 24 -
5.1. Safety inspection before commissioning............................................ - 35 -
8.3. Efficiency,Protection and Communication......................................... - 56 -