![Sofar solar 10k-20ktl User Manual Download Page 11](http://html.mh-extra.com/html/sofar-solar/10k-20ktl/10k-20ktl_user-manual_1311965011.webp)
After unpacking the Sunny Horse Series, check whether deliverables are intact and complete.
If any damage is found or any component is missed, contact the dealer.
3.1 Installation Process
Figure3-1 Installation flowchart
Start
Check before
installation
Prepare installation
tools
Determine the
installation position
Moving the Sunny
Horse Series
Installation the rear
panel
Installation the
Sunny Horse Series
End
3.2 Checking Before Installation
Checking Outer Packing Materials
Checking Deliverables
Packing materials and components may be damaged during transportation. Therefore, check
the outer packing materials before installing the Sunny Horse Series. Checking the surface of
packing materials for damage, such as holes and cracks. If any damage is found, do not
unpack the Sunny Horse Series and contact the dealer as soon as possible. You are advised to
remove the packing materials within 24 hours before installing the Sunny Horse Series.
All rights reserved
Shenzhen SOFARSOLAR Co ., Ltd.
C
Document Version 2.0(2016.03.29)
15
All rights reserved
Shenzhen SOFARSOLAR Co ., Ltd.
C
Document Version 2.0(2016.03.29)
16
User manual
User manual
Installation
Installation
Sunny Horse Series
(
10K~20KTL)
Sunny Horse Series
(
10K~20KTL)
No.
1
Pictures
2
3
4
5
6
7
8
9
10
11
1PCS
1PCS
4PCS
Sunny Horse Series
Rear panel
DC+ input terminal
DC- input terminal
Metal terminals secured to DC+ input
power cables
M6 Hexagon screws
M8*80 Expansion bolts used to secure the
rear panel to the wall
Manual
The warranty card
Certificate
Table3-1 shows the components and mechanical parts that should be delivered
Quantity
Description
4PCS
4PCS
4PCS
1PCS
6PCS
1PCS
1PCS
1PCS
Metal terminals secured to DC- input
power cables