Maintenance – 8
AB85J – 0421900
Frequent Inspection and Maintenance – Every 90 Days or 150 Hours
Item
Procedure
Information
OK
Engine
Charging system
Check for proper operation
Air filter
Check for wear and damage
Hour meter
Check for proper operation
Belts and hoses
Check for wear and damage
Hydraulic pump
Check for proper operation
Battery terminals
Clean terminals and check cable
condition
Battery electrolyte
Check electrolyte levels
Add distilled water if
necessary
Indicator gauges
Check for wear/damage and proper
operation
Engine oil
Check for wear and damage/level
Between add and full
Engine coolant
Check level
Between add and full
Engine Start – Stop
Check for proper operation
Electric throttle
Check for proper operation
Electric choke, if equipped
Check for proper operation
Engine governor setting
Check for proper operation
Platform Rotator
Structural
Check for damage and cracked welds
Hydraulic rotator actuator
Check for leaks, wear, and damage
Platform rotation holding valve
Check for proper operation
Mounting bolts and pin caps
Verify that all fasteners are in place
and are tight
Jib Rotator – AB85RJ
Structural
Check for damage and cracked welds
Hydraulic rotator actuator
Check for leaks, wear, and damage
Jib rotation holding valve
Check for proper operation
Mounting bolts and pin caps
Verify that all fasteners are in place
and are tight
Options
110 volt AC generator
Check for proper operation
220 volt AC generator
Check for proper operation
Dual fuel system
Check condition and for proper operation
LP gas system and control
Check condition and for proper operation
Drive motion alarm
Check for proper operation
Flashing light
Check for proper operation
Cold weather start kit – diesel only
Check for proper operation
Hydraulic system cold weather warm
up kit
Check for proper operation
Driving lights
Check for proper operation
Platform work lights
Check for proper operation
Platform control cover
Check condition and for proper operation
Sandblast protection kit
Check for proper operation
Airline to platform
Check for proper operation
Spark arrestor muffler – Deutz only
Check for wear and damage
Platform welder
Check condition and for proper operation
Platform glazier package
Check condition and for proper operation
Optional platform
Verify that all fasteners are in place
and are tight
Summary of Contents for AB85J
Page 21: ...REPAIR PARTS AB85J PARTS MANUAL BRAKE UNIT BRAKE UNIT Wed Feb 24 08 35 56 UTC 2021 2 4...
Page 23: ...REPAIR PARTS AB85J PARTS MANUAL GEAR HUB OMNI GEAR HUB OMNI Wed Feb 24 08 35 57 UTC 2021 2 5...
Page 26: ...REPAIR PARTS AB85J PARTS MANUAL GEAR HUB GEAR HUB Wed Feb 24 08 35 58 UTC 2021 2 6...
Page 52: ...REPAIR PARTS AB85J PARTS MANUAL PINION GUARD PINION GUARD Wed Feb 24 08 36 01 UTC 2021 2 15...
Page 270: ...HYDRAULICS AB85J PARTS MANUAL SWING DRIVE SWING DRIVE Wed Feb 24 08 36 47 UTC 2021 3 18...
Page 305: ...AB85J PARTS MANUAL BOOM HYDRAULICS BOOM HYDRAULICS Wed Feb 24 08 36 53 UTC 2021 3 33...
Page 359: ...AB85J PARTS MANUAL WIRING BOX ASSEMBLY WIRING BOX ASSEMBLY Wed Feb 24 08 37 04 UTC 2021 4 4...
Page 369: ...AB85J PARTS MANUAL WIRING BOX ASSEMBLY WIRING BOX ASSEMBLY Wed Feb 24 08 37 07 UTC 2021 4 7...
Page 379: ...AB85J PARTS MANUAL PANEL SUB ASSEMBLY PANEL SUB ASSEMBLY Wed Feb 24 08 37 09 UTC 2021 4 11...
Page 446: ...AB85J PARTS MANUAL HYDRAULIC WARM UP HYDRAULIC WARM UP Wed Feb 24 08 37 23 UTC 2021 5 2...
Page 526: ...Maintenance 4 AB85J 0421900...
Page 532: ...Maintenance 10 AB85J 0421900...
Page 534: ...Maintenance 12 AB85J 0421900...
Page 535: ...AB85J 0421900 Maintenance 13 Major Repairs Date Part Number Part Description Repair Performed...
Page 536: ...Maintenance 14 AB85J 0421900...
Page 543: ......
Page 544: ......
Page 546: ......
Page 547: ......
Page 548: ......
Page 549: ......
Page 550: ......
Page 551: ......
Page 552: ......
Page 553: ......
Page 554: ......