Maintenance – 6
AB85J – 0421900
Frequent Inspection and Maintenance – Every 90 Days or 150 Hours
Item
Procedure
Information
OK
Lower Controls
Control switch in the lower controls
position
Check for proper operation
With selector in the lower
controls position, upper
controls do not work
Station selector switch in the upper
controls position
Check for proper operation
With selector in the upper
controls position, lower
controls do not work
Engine Start – Stop
Check for proper operation
Throttle High – Low
Check for proper operation
Turntable CW – CCW
Check for proper operation
Boom elevation Up – Down
Check for proper operation
Boom Extend – Retract
Check for proper operation
Jib Up – Down
Check for proper operation
Jib rotation CW – CCW
Check for proper operation
Platform level Up – Down
Check for proper operation
Platform rotation CW – CCW
Check for proper operation
Emergency power, all functions
Check for proper operation
Emergency stop
Check for proper operation
Booms
Structural
Check for damage and cracked
welds
Lift cylinder pin caps and tie wire
Verify that all fasteners are in place
and are tight
Hydraulic tubes and hoses
Check for leaks, wear, and damage
Extension cylinder pin caps and
tie wire
Verify that all fasteners are in place
and are tight
Extension cylinder and holding valve Check for leaks, wear, damage, and
for proper operation
Jib boom pin caps and snap rings
Verify that all fasteners are in place
and properly installed
Jib cylinder pin caps and snap rings
Verify that all fasteners are in place
and properly installed
Jib cylinder and holding valve
Check for leaks, wear, damage, and
for proper operation
Slave level cylinder pin caps and tie
wire
Verify that all fasteners are in place
and are tight
Slave level cylinder and holding
valves
Check for leaks, wear, damage, and
for proper operation
Hose carrier tube and support
Check for residue buildup/proper
operation
Plastic hose track
Check for wear and damage
Electrical wires
Check for wear and damage
Decals and placards
Check for damage and readability
Order replacements as necessary
Summary of Contents for AB85J
Page 21: ...REPAIR PARTS AB85J PARTS MANUAL BRAKE UNIT BRAKE UNIT Wed Feb 24 08 35 56 UTC 2021 2 4...
Page 23: ...REPAIR PARTS AB85J PARTS MANUAL GEAR HUB OMNI GEAR HUB OMNI Wed Feb 24 08 35 57 UTC 2021 2 5...
Page 26: ...REPAIR PARTS AB85J PARTS MANUAL GEAR HUB GEAR HUB Wed Feb 24 08 35 58 UTC 2021 2 6...
Page 52: ...REPAIR PARTS AB85J PARTS MANUAL PINION GUARD PINION GUARD Wed Feb 24 08 36 01 UTC 2021 2 15...
Page 270: ...HYDRAULICS AB85J PARTS MANUAL SWING DRIVE SWING DRIVE Wed Feb 24 08 36 47 UTC 2021 3 18...
Page 305: ...AB85J PARTS MANUAL BOOM HYDRAULICS BOOM HYDRAULICS Wed Feb 24 08 36 53 UTC 2021 3 33...
Page 359: ...AB85J PARTS MANUAL WIRING BOX ASSEMBLY WIRING BOX ASSEMBLY Wed Feb 24 08 37 04 UTC 2021 4 4...
Page 369: ...AB85J PARTS MANUAL WIRING BOX ASSEMBLY WIRING BOX ASSEMBLY Wed Feb 24 08 37 07 UTC 2021 4 7...
Page 379: ...AB85J PARTS MANUAL PANEL SUB ASSEMBLY PANEL SUB ASSEMBLY Wed Feb 24 08 37 09 UTC 2021 4 11...
Page 446: ...AB85J PARTS MANUAL HYDRAULIC WARM UP HYDRAULIC WARM UP Wed Feb 24 08 37 23 UTC 2021 5 2...
Page 526: ...Maintenance 4 AB85J 0421900...
Page 532: ...Maintenance 10 AB85J 0421900...
Page 534: ...Maintenance 12 AB85J 0421900...
Page 535: ...AB85J 0421900 Maintenance 13 Major Repairs Date Part Number Part Description Repair Performed...
Page 536: ...Maintenance 14 AB85J 0421900...
Page 543: ......
Page 544: ......
Page 546: ......
Page 547: ......
Page 548: ......
Page 549: ......
Page 550: ......
Page 551: ......
Page 552: ......
Page 553: ......
Page 554: ......