background image

 10mm 

M8 BOLT POSITIONS x 12

BOOT

OPENING

CENTER

ARROW TO

BOOT

OPENING

A

A

A

A

B

B

B

B

HANDLE

FRONT

The gas connection must be carried out by an authorised 

and licensed gas fitter and the installation must meet the the Australian and 

New Zealand Standards AS/NZS5601 and AS/NZS5263.

See Smiths Barbeque user manual and install instruction.

 

BBQ TO FACE FRONT OF CARAVAN

SCREW M6x12 SCREWS INTO HOLES MARKED A

BBQ TO FACE REAR OF CARAVAN

SCREW M6x12 SCREWS INTO HOLES MARKED B

INSTALLATION PROCEDURE

STEP 4

Mark four holes minimum. Two at the rear and two at the front and on opposite sides. Remove the slide system 

to drill minimum four holes through the tunnel boot floor.Position the slide system back into place and align all

holes. Bolt the slide system into place and use low head 8mm bolts. Use large washers and either Nyloc nuts, 

Locking Nuts and loctite. The washers and nuts must be on the bottom side - under the tunnel boot floor.

STEP 5

Place the barbeque upside down onto carpet, towel or something that will not mark and damage the stainless steel hood. 

Screw the two mounting brackets to each side of the barbeque using four M6x12 Screws provided.

STEP 6

Unclip the bbq slide system and pull it out to it’s fullest extension. Position the barbeque onto the slide system so 

that the barbeque sides are parallel with the caravan side. You must not fit the barbeque so the front of the barbeque 

is parallel to the caravan side as the hood will hit on the caravan side. If you want to mount the barbeque so the front

 is parallel with the caravan side, you must install the Smiths Slide System SBBQS800 - 800mm model.

Align the slide system tray holes with the Barbeque mounting brackets. Do this from underneath the slide system. 

Use the four M6x12 screws provided and screw together. We recommend to use loctite.