G
G
J
H
I
Radius
Maximum
is 25mm
330mm
Minumum
Hood Lid
570mm
250mm
Minumum
Flat Lid
measure and
mark 10mm in
from edge of boot
opening
mark the center
of opening
Make sure the slide
system bottom is flush
with the tunnel boot
opening bottom
horizontal edge
Packing may be
required so slide system
can protrude past boot
door / opening
The slide system must be mounted
only on kerb side of the caravan.
INSTALLATION PROCEDURE
STEP 1
Check the Tunnel Boot opening sizes to ensure the Smiths Barbeque and Smiths Slide System will fit.
STEP 2
The Smiths Slide System is designed to be installed flush with the bottom of the tunnel boot opening.
If the floor is lower than this opening, packing such as melamine/mdf/ply will be required to be placed
between the floor and the slide system to raise the slide system to the correct height.
STEP 3
Measure in 10mm and mark. Position the slide system in place and align the front with the mark. The slide
system needs to be in 10mm so the barbeque spring clip lever does not hit the tunnel boot door when closed.
Also position the slide system so it is centred. Ensure the slide system is in place and the arrows in the
brackets face towards the tunnel boot door.