Quick Start Guide
– 4 –
4. Connect Power
If you do not power the unit using PoE, connect the AC power adapter to the AP
and to an AC power source.
5. Verify AP Operation
Verify basic AP operation by checking the system LEDs.
The Power LED should be on green and the Network LED on or flashing amber.
Connect the power adapter to the power socket.
Connect the power adapter to a nearby AC power source.
1
2
1
2
Network Link/Activity
Power/Diagnostic
2
1
1
2