I
NSTALLING
THE
R
EDUNDANT
P
OWER
U
NIT
2-3
Optional Rack-Mounting Equipment
If you plan to rack-mount the RPU, be sure to have the following
equipment available:
•
Four mounting screws for each device you plan to install in a
rack—these are not included
•
A screwdriver (Phillips or flathead, depending on the type of screws
used)
Mounting
RPU units can be mounted in a standard 19-inch equipment rack or on a
desktop or shelf. Mounting instructions for each type of site follow.
Rack Mounting
Before rack mounting the unit, pay particular attention to the following
factors:
•
Temperature: Since the temperature within a rack assembly may be
higher than the ambient room temperature, check that the
rack-environment temperature is within the specified operating
temperature range.
•
Mechanical Loading: Do not place any equipment on top of a
rack-mounted unit.
•
Circuit Overloading: Be sure that the supply circuit to the rack
assembly is not overloaded.
•
Grounding: Rack-mounted equipment should be properly grounded.
Particular attention should be given to supply connections other than
direct connections to the mains.
Summary of Contents for RPUPOE
Page 2: ......
Page 14: ...COMPLIANCES x ...
Page 18: ...FIGURES xiv ...
Page 36: ...SPECIFICATIONS B 4 ...
Page 39: ......