Select a DC power supply with adequate capacity with low ripple.
Ex. : Class 2 voltage source. UL1310 compliant.
For communication master (PLC), we recommend using a product for Profibus communication
with SELV circuit which is compliant to IEC 60950-1, electrical safety standard.
■ LED indication
Item
Lights up
Goes off
RUN
Lights when the power is turned on (Green) Light off when the power is cut
DIA
Lights when diagnostic error occurs (Red)
Internal operation is normal
BF
Lights when PROFIBUS communication error
occurs (Red)
PROFIBUS communication is
normal
Mounting and Installation
■
Installation
Direct mounting
When the product is mounted directly
onto the panel or device, use screws
suitable for the thread holes below.
(See drawing on the right)
Direct mounting Bracket mounting
Series
Mounting
thread
hole
Tightening
torque
ITV1000
M4×0.7 (Depth 6) 2〜3N・m
ITV2000,
ITV3000
M5×0.8 (Through) 5〜6N・m
Bracket mounting
When the bracket is mounted to the product
for mounting it onto the panel or device,
fix the bracket to the product with the screws provided. (See table above for tightening
torque).
The hole of φ7 has become empty in the bracket for a fixed screw.
■ Connector mounting
When mounting the connector with cable to the product, match up the position of the connector
groove (cable side) and key (product side).
Power supply connector key
Communication connector key
―6―