![SMC Networks HRG001-A Operation Manual Download Page 27](http://html1.mh-extra.com/html/smc-networks/hrg001-a/hrg001-a_operation-manual_1298854027.webp)
HRX-OM-J022
4 Startup and Shutdown
HRG001-W HRG002-W HRG005-W
4.1 Pre-check
1
st
edition :Jul. 2005
4-1
4. Startup and Shutdown
4.1 Pre-check
Check the following items before starting up the unit.
4.1.1 Installation
condition
z
Make sure the unit is installed horizontally.
z
Do not put any heavy object on the unit or apply excess force by piping.
4.1.2
Connection of cable
Check that the power cable, ground and I/O signal cables are correctly
connected.
4.1.3
Piping for cooling water
Check that piping for cooling water IN and OUT are correctly connected.
4.1.4
Piping for circulating fluid
Check the I/O piping of the circulating fluid is installed correctly.
4.1.5
Level indicator (for level in the tank)
Check the fluid level is within the specified range.
Personnel with adequate knowledge and experiences of this product
and peripheral devices shall be in charge of starting up and shutting
down the unit.