BACnet Explorer Start-up Guide
Page 6 of 24
3
OPERATION
3.1 Power up the device
Apply power to the device. Ensure that the power supply used complies with the specifications provided
in
. Ensure that the cab
le is grounded using the “Frame GND” terminal. The BACnet
Explorer is factory set for 9-30VDC or 12-24VAC.
PWR+
PWR-
FG
Figure 3: Power connection