C
HAPTER
3
| Installing the Switch
Installation
– 27 –
2.
Use suitable screws (not provided) to secure the brackets to the rack, as
illustrated in the following figure.
Figure 6: Mounting the Switch
3.
Connect the switch to a power source with the provided power cord. See
“Powering On” on page 28
.
C
ONNECTING
TO
G
ROUND
Connecting the switch to ground protects against lightning over-voltage and
over-current of the switch, which is also a necessary measure to protect the
body from electric shock.
In different environments, the switch may be grounded differently. The following
instructs you to connect the switch to ground through the power cord. Connect
the switch to ground in the best way according to your specific operating
environment.
EZ Switch 10/100/1000Mbps
16-Port Gigabit Ethernet PoE Switch
Summary of Contents for EZ Switch SMCGS1601P
Page 1: ...USER GUIDE EZ SwitchTM 10 100 1000 16 Port Unmanaged Gigabit Ethernet PoE Switch SMCGS1601P...
Page 12: ...COMPLIANCES AND SAFETY STATEMENTS 12...
Page 14: ...ABOUT THIS GUIDE 14...
Page 20: ...CHAPTER 1 Introduction Overview 20...
Page 30: ...CHAPTER 3 Installing the Switch Connecting Network Devices 30...
Page 38: ...APPENDIX B Specifications Physical Characteristics 38...
Page 39: ......