前付 8
Piping
(1)
Refer to the Fittings and Tubing Precautions (Best Pneumatics No.6) for handling one touch fittings.
(2)
Preparation before piping
Before piping is connected, it should be thoroughly blown out with air (flushing) or washed to remove chips,
cutting oil and other debris from inside the pipe.
(3)
Wrapping of pipe tape
When screwing piping or fittings into ports, ensure that chips from the pipe threads or sealing material do not
enter the piping. Also, if pipe tape is used, leave 1.5 to 2 thread ridges exposed at the end of the threads.
Speed and cushion adjustment
(1)
To make a speed adjustment, gradually adjust starting from the low speed end.
If the speed adjustment is performed from the high speed end, it could damage the product.
As a result, it could pose a hazard to humans and damage the machinery and equipment.
For products with shock absorbers, when the shock absorber stops moving before reaching the stroke
end by using a stopper mechanism with the objective of shortening tact time, be sure the shock
absorber is stopped in a position where it has adequately absorbed the kinetic energy.
Failure to do so can result in damage to equipment.
Lubrication
(1)
This product should be used without lubrication. Although it will operate even if it is lubricated, it could
lead to sticking or slipping.
Pipe tape
Leave approx.
2 threads exposed
Winding
direction
Caution
Warning
Warning