E
QUIPMENT
C
HECKLIST
3-3
Equipment Checklist
After unpacking the switch, check the contents to be sure you have
received all the components. Then, before beginning the installation, be
sure you have all other necessary installation equipment.
Package Contents
• TigerSwitch 10/100, SMC6128PL2
• Four adhesive foot pads
• Bracket Mounting Kit containing two brackets and eight screws for
attaching the brackets to the switch
• Power Cord
• RS-232 console cable
• This Installation Guide
• Management Guide CD
Optional Rack-Mounting Equipment
If you plan to rack-mount the switch, be sure to have the following
equipment available:
• Four mounting screws for each device you plan to install in a rack—these
are not included
• A screwdriver (Phillips or flathead, depending on the type of screws used)
Summary of Contents for 6128PL2
Page 2: ......
Page 14: ...COMPLIANCESS xiv ...
Page 20: ...xx ...
Page 28: ...ABOUT THE TIGERSWITCH 1 8 ...
Page 36: ...NETWORK PLANNING 2 8 ...
Page 46: ...INSTALLING THE SWITCH 3 10 ...
Page 58: ...MAKING NETWORK CONNECTIONS 4 12 ...
Page 70: ...SPECIFICATIONS C 4 Safety UL CUL UL 60950 1 CSA 22 2 NO60950 1 TUV GS EN60950 1 CB IEC60950 1 ...
Page 72: ...ORDERING INFORMATION D 2 ...
Page 82: ...Glossary 6 ...
Page 85: ...INDEX Index 3 W Web based management 1 3 ...
Page 86: ...INDEX Index 4 ...
Page 87: ......