3-1
C
HAPTER
3
I
NSTALLING
THE
S
WITCH
Selecting a Site
TigerSwitch units can be mounted in a standard 19-inch equipment rack or
on a flat surface. Be sure to follow the guidelines below when choosing a
location.
• The site should:
- be at the center of all the devices you want to link and near a power
outlet.
- be able to maintain its temperature within 0 to 45 °C (32 to 113 °F) and
its humidity within 10% to 90%, non-condensing
- provide adequate space (approximately two inches) on all sides for
proper air flow
- be accessible for installing, cabling and maintaining the devices
- allow the status LEDs to be clearly visible
• Make sure twisted-pair cable is always routed away from power lines,
fluorescent lighting fixtures and other sources of electrical interference,
such as radios and transmitters.
• Make sure that a separate grounded power outlet that provides 100 to 240
VAC, 50 to 60 Hz, is within 2.44 m (8 feet) of each device and is powered
from an independent circuit breaker. As with any equipment, using a
filter or surge suppressor is recommended.
Summary of Contents for 6128PL2
Page 2: ......
Page 14: ...COMPLIANCESS xiv ...
Page 20: ...xx ...
Page 28: ...ABOUT THE TIGERSWITCH 1 8 ...
Page 36: ...NETWORK PLANNING 2 8 ...
Page 46: ...INSTALLING THE SWITCH 3 10 ...
Page 58: ...MAKING NETWORK CONNECTIONS 4 12 ...
Page 70: ...SPECIFICATIONS C 4 Safety UL CUL UL 60950 1 CSA 22 2 NO60950 1 TUV GS EN60950 1 CB IEC60950 1 ...
Page 72: ...ORDERING INFORMATION D 2 ...
Page 82: ...Glossary 6 ...
Page 85: ...INDEX Index 3 W Web based management 1 3 ...
Page 86: ...INDEX Index 4 ...
Page 87: ......