Preparation for Operation
06/18/04
7-3
7.4 Check
The following checks shall be performed before operation.
7.4.1 Daily check
1) Indication of display panel : Check temperature condition and confirm whether or not the alarm occurs.
2) Filter : Confirm there is not attachment of the dust on the filter at suction port. A lot of attachment
may impair performance of the filter. We will recommend the removal of dust once every three months.
3) Confirm there is no leakage of circulating liquid or no bending or crush of the piping of circulating
liquid.
4) Confirm there is no abnormal sound or smell or abnormal heating of the case.
The performance decreases, and removes it, please when dust adheres
to the air filter. We will recommend the removal of dust once every three
months. Please remove dust with the cleaner, and use neither water nor
the hot water.
7.4.2 Check after seismic vibration and impact
1) Piping: Confirm there is no defect including disconnection in piping.
2) Electrical wiring: Confirm there is disconnection of the connector from the cable.
3) Mounting condition: If the Thermo-con is mounted for operation, confirm the Thermo-con is mounted
securely.
4) Circulating liquid: Confirm there is no leakage.
5) Others: Confirm there is no abnormal sound or smell or abnormal heating of the case.