Technical Information
smb
Skyclimber
Seilspielgeräte GmbH Berlin
Page 8
Handwerkerstraße 7
15366 Dahlwitz-Hoppegarten
Phone (+49 33 42) 50 837 20
Fax (+49 33 42) 50 837 80
4.4 Securing the space net
After tensioning, the tension nuts are to be locked on all K30 knot points using the locked nuts and
spring lock washer provided (M20 Size 32). In order to tighten the locking nut, the Allen key Size 10
must be inserted into the M20 screw and held (Figure 16). The locking nuts Size 30 (Figure 17) are to
be inspected once again to ensure that they are solidly secure at the K31 and K32 knot points. Finally
all knot points from K29 to K32 are to be closed by screwing the knots with the prepared covers via a
clamping screw (Figure 16). In doing this please ensure that the cover is positioned evenly so that our
company logo is readable. Thank you.
5. Maintenance instructions EN 1176-1:
5.1 Visual routine inspection
The frequency of inspections should be oriented on local conditions (high or low amount of use,
vandalism, air contamination, weather effects etc.).
The space net and the hammock are to be checked for damage, especially breaks in the wire.
The climber panels as well as the climber grips are to be checked for damage (e.g. cracks).
All fixtures of the climber panels and the climber grips are to be checked.
It is to be ensured that all hollow balls are closed.
The clamps of the climbing plates should be tight. In case the screw connection is loose, please tighten it.
Check the climbing holds for tightness or damage. If the screw connection is loose, please tighten it.
Replace the climbing holds in case of any damage.
Remember to re-tension!
The first re-tension of the space net is to be made already after one to two weeks of use (refer to
the operative inspection for the procedure).