ASSEMBLE SIDE PANELS 

SELECT: 

 

4 x 1.880 m Gable Wall Sheets (Angled) 

4 x 1.940 m Gable Wall Sheets (Angled) 

2 x 2.000 m Gable Wall Sheets (Angled) 

2 x 2.520 m Top Plates (Red)

 

2 x 2.520 m Bottom Plates (Green)

 

120 x 30mm Galv Clouts

 

16 x Rivets

 

IMPORTANT—IF YOU CHOOSE TO RAISE YOUR TIMBER 

BASE PLATE –READ THE FOLLOWING; 

 

For sheds with Raised Base Plate option only (see page 5), deduct 

30mm from measurement shown between Top and Bottom Plates on 
all wall panels, so cladding protrudes 20mm below bottom plate

STEP 1: 

 

 

Lay out 1 x Top plate and 1 x  Bottom plate on a flat surface as shown 
(corner cut-outs to face outwards). 

Measurements between Top and 

Bottom plates are critical to ensure wall panels fit together. 

STEP 2: 

 

 

Place 2 x 1.880 m wall sheets, 2 x 1.940 m wall sheets and 1 x 
2.000m wall sheet on top of timber plates with bottom of sheets 
flush with each other.

 

 

Rivet sheets together on overlaps as shown

.

 

STEP 3: 

 

 

Nail wall sheets to the Top Plate at each end making 
sure that the top corners of the sheets are flush with 
the top of the Top Plate and that the sides of the wall 
sheet overhang the Top Plate by approx 15mm as 
shown. 

 

 

Check that the Top Plate is straight then nail the  

      Wall sheet to the Top Plate, 2 clouts per pan.  
     (see 

fig. 1

). 

Std Shed —

 

Bottom Plate will protrude below 

wall sheet by approximately 10mm.  
 
Raised base plate shed —

 

Wall sheet will protrude  

below the Bottom Plate by 20mm

 

STEP 4: 

 

 

Nail the wall sheets to the Bottom Plate at each end ensuring each side 
of wall sheets overhangs the end of Bottom Plate by 15mm. Check that 
the distance between the Top and Bottom Plates is correct. (As per 
diagram in step 1) 

 

 

Check that the Bottom Plate is straight then nail the wall sheets to the 
Bottom Plate, two clouts per pan (see fig. 1).

 

fig.1 

RIB

 

PAN

 

CLOUT

 

TIMBER PLATE

 

TOP PLATE 

BOTTOM PLATE 

RIVET 

RIVET 

RIVET 

RIVET 

TOP PLATE 

15mm 

15mm 

BOTTOM PLATE 

1810mm 

1810mm 

TOP PLATE 

BOTTOM PLATE 

15mm 

15mm 

1810mm 

1810mm 

TOP PLATE 

REPEAT  THESE STEPS TO MAKE SECOND SIDE WALL PANEL 

15mm

 

RIVET 

RIVET 

RIVET 

RIVET 

Summary of Contents for SS3025

Page 1: ...ASSEMBLY INSTRUCTIONS SS3025 BASE SIZE 3 020m x 2 520m...

Page 2: ......

Page 3: ...cladding used in Smart Store Sheds Wash all surfaces annually using a hose and soft nylon brush Within 2 km of coast wash every 3 months as above After a storm wash the cladding and the gutters as so...

Page 4: ...m 2 Roof 1 350 m 12 Weatherstrip 1 810 m 1 Door 3 4 Sheet 1 810 m 3 Barge 1 350 m 4 TIMBER Ridge Flashing 1 800 m 2 Bottom Plates H4 Green Front Back 3 020 m 2 Padbolt Support Front 0 140 m 1 Bottom...

Page 5: ...de Back Wall Sheets Front Wall Sheets Door Jambs Front Wall Sheet Door Side Flashing Hinge Door Brace Door Top Bottom Channel Ridge Beam Jack Stud Ridge Flashings x 2 5 ASSEMBLE FRONT PANEL 6 ASSEMBLE...

Page 6: ...coming through from underneath During construction you may raise the bottom timber plate to allow the wall cladding to protrude 20mm below the bottom plate This will stop water flowing between the bot...

Page 7: ...or as shown Drill and rivet as per dia gram ensuring rivets penetrate into door sheet STEP 4 Rivet door brace flashings onto back of door as shown Where possible rivet from front of door Ensure the do...

Page 8: ...n STEP 3 Nail wall sheets to the Top Plate at each end making sure that the top corners of the sheets are flush with the top of the Top Plate and that the sides of the wall sheet overhang the Top Plat...

Page 9: ...ate using two clouts per pan STEP 4 Nail the wall sheets to the Bottom Plate at each end ensuring that each side of the wall sheets overhangs the Bottom Plate by 15mm and that the distance between the...

Page 10: ...ing Ensure the doors close properly then fit remaining rivets STEP 3 Place 3 x Wall Sheets on timber plates and rivet the sheets together as shown Ensure that the top of the sheet is flush with the to...

Page 11: ...g someone to support the panels while they are screwed together Before fixing ensure that the Side Panel overlaps the Back Panel Using 4 x 40mm screws 2 per join screw the Top and Bottom Plates togeth...

Page 12: ...heck that the shed is sitting level and square and that the diagonal Top Plate measurements are the same fig 1 JACK STUD TOP PLATE RIDGE BEAM fig 2 fig 3 15mm JACK STUD RIDGE BEAM TOP PLATE ROOF SHEET...

Page 13: ...PLATE STEP 3 Position 1 x roof sheet slotted end facing back so that the top of the sheet is at the centre of the Ridge Beam and the side of the sheet over hangs the end of the Ridge Beam and the Top...

Page 14: ...ENTRY FLOOR Position the Floor Joists centrally between the side Base Plates and skew nail each end with two 75mm nails Check that the shed is sitting level and square and that the diagonal Bottom Pla...

Page 15: ......

Page 16: ...s less than 200g m2 as published by Branz Warranty certificate being returned to manufacturer within 21 days of purchase together with proof of purchase This warranty does not cover the following Fast...

Reviews: