ROOF  ASSEMBLY 

SELECT: 

 

12 x 1.350 m Roof Sheets 

2 x 3.050 m Spouting 

4 x 1.350 m Barges 

2 x 1.800 m Ridge Flashing 

1 x 3.020 m Ridge Beam 

2 x 0.200 m Jack Studs 

8 x 75mm Screws 

76 x 40mm Weatherseal Nails 

66 x Rivets

 

11 

IMPORTANT—FOR SHEDS WITH OPTIONAL CLEAR ROOF 

PANEL 

 

Assemble as below, making sure that the Clear Roof Sheets over-
lap the standard roof sheets on both sides.  
The Clear Roof Panel must be secured to the Top Plate and the 
Ridge Beam. Pre drill and fasten with the 40mm weatherseal nails 
provided.

.

 

STEP 1: 

 

 

Place the Ridge Beam on a level surface and use 2 x 75mm screws 
to secure the Jack Studs to the underside of the Ridge Beam, one at 
each end (

fig. 1

). 

 

 

Turn the Ridge Beam /Jack Stud assembly over and place it on the 
timber Top Plate in a central position.  

 

 

Secure with 2 x  75mm screws through the top of the Jack Studs 
into the Timber Top Plate (

fig. 2

). 

 

 

Check that the shed is sitting level and square and that the diagonal 
Top Plate measurements are the same. 

fig. 1

 

JACK STUD

 

TOP PLATE

 

RIDGE BEAM

 

fig. 2

 

fig. 3

 

15mm

 

JACK STUD

 

RIDGE BEAM

 

TOP PLATE

 

ROOF SHEET

 

SIDE

 

WALL

 

FRONT WALL

 

BACK WALL

 

SIDE

 

WALL

 

TOP PLATE 

BOTTOM PLATE 

RIDGE

 

BEAM

 

SIDE

 

WALL

 

FRONT WALL

 

BACK WALL

 

SIDE

 

WALL

 

TOP PLATE 

BOTTOM PLATE 

STEP 2: 

 

 

Position the first Roof Sheet (slotted end facing front) so that the top 
of the sheet is at the centre of the Ridge Beam and the side of the 
sheet over hangs the end of the Ridge Beam (

fig .3

). Using 1 x 

weatherseal , nail in the top corner. Nail the lower corner  ensuring 
15mm overhang. 

 

 

Position the remaining front Roof Sheets and rivet them together as 
shown ensuring  slots at the front line up with each other. 

 

 

Nail the last sheet to the Ridge Beam and the Top Plate ensuing  
the Roof Sheet overhangs the end of the Ridge Beam and the Top 
Plate by 15mm. 

 

 

 Nail front Roof Sheets to Ridge Beam and Top Plate (1 x weather-
seal per pan, 

fig.4

) ensuring Ridge Beam and Top Plate are straight. 

 

 

Repeat with remaining roof sheets 

fig. 4

 

Summary of Contents for SS3025

Page 1: ...ASSEMBLY INSTRUCTIONS SS3025 BASE SIZE 3 020m x 2 520m...

Page 2: ......

Page 3: ...cladding used in Smart Store Sheds Wash all surfaces annually using a hose and soft nylon brush Within 2 km of coast wash every 3 months as above After a storm wash the cladding and the gutters as so...

Page 4: ...m 2 Roof 1 350 m 12 Weatherstrip 1 810 m 1 Door 3 4 Sheet 1 810 m 3 Barge 1 350 m 4 TIMBER Ridge Flashing 1 800 m 2 Bottom Plates H4 Green Front Back 3 020 m 2 Padbolt Support Front 0 140 m 1 Bottom...

Page 5: ...de Back Wall Sheets Front Wall Sheets Door Jambs Front Wall Sheet Door Side Flashing Hinge Door Brace Door Top Bottom Channel Ridge Beam Jack Stud Ridge Flashings x 2 5 ASSEMBLE FRONT PANEL 6 ASSEMBLE...

Page 6: ...coming through from underneath During construction you may raise the bottom timber plate to allow the wall cladding to protrude 20mm below the bottom plate This will stop water flowing between the bot...

Page 7: ...or as shown Drill and rivet as per dia gram ensuring rivets penetrate into door sheet STEP 4 Rivet door brace flashings onto back of door as shown Where possible rivet from front of door Ensure the do...

Page 8: ...n STEP 3 Nail wall sheets to the Top Plate at each end making sure that the top corners of the sheets are flush with the top of the Top Plate and that the sides of the wall sheet overhang the Top Plat...

Page 9: ...ate using two clouts per pan STEP 4 Nail the wall sheets to the Bottom Plate at each end ensuring that each side of the wall sheets overhangs the Bottom Plate by 15mm and that the distance between the...

Page 10: ...ing Ensure the doors close properly then fit remaining rivets STEP 3 Place 3 x Wall Sheets on timber plates and rivet the sheets together as shown Ensure that the top of the sheet is flush with the to...

Page 11: ...g someone to support the panels while they are screwed together Before fixing ensure that the Side Panel overlaps the Back Panel Using 4 x 40mm screws 2 per join screw the Top and Bottom Plates togeth...

Page 12: ...heck that the shed is sitting level and square and that the diagonal Top Plate measurements are the same fig 1 JACK STUD TOP PLATE RIDGE BEAM fig 2 fig 3 15mm JACK STUD RIDGE BEAM TOP PLATE ROOF SHEET...

Page 13: ...PLATE STEP 3 Position 1 x roof sheet slotted end facing back so that the top of the sheet is at the centre of the Ridge Beam and the side of the sheet over hangs the end of the Ridge Beam and the Top...

Page 14: ...ENTRY FLOOR Position the Floor Joists centrally between the side Base Plates and skew nail each end with two 75mm nails Check that the shed is sitting level and square and that the diagonal Bottom Pla...

Page 15: ......

Page 16: ...s less than 200g m2 as published by Branz Warranty certificate being returned to manufacturer within 21 days of purchase together with proof of purchase This warranty does not cover the following Fast...

Reviews: