STEP 6: 

 

 

Place barge flashings on roof at end of shed ensuring 
the diagonal trimmed end is facing out. 

 

 

Rivet the Barge Flashings to the roof and the side wall, 
using four rivets on top of barge and four into the side 
(

fig.2

).

 

fig.1 

STEP 4: 

 

 

Position the second Roof Sheet, ensuring the slots line up with 

the first sheet. 

 

 

Rivet together as shown. 

 

 

Nail off as per Step 4. 

 

 

Rivet and nail off the remaining Roof Sheets, ensuring the ribs 

line up with the front Roof Sheets and the back Wall Sheets.

 

fig.1 

SIDE 

WALL 

FRONT 

WALL 

BACK 

WALL 

SIDE 

WALL 

TOP PLATE 

BOTTOM PLATE 

RIDGE BEAM 

SIDE

 

WALL

 

FRONT WALL

 

BACK WALL

 

SIDE

 

WALL

 

TOP PLATE 

BOTTOM PLATE 

STEP 3: 

 

 

Position 1 x roof sheet (slotted end facing back) so that the 
top of the sheet is at the centre of the Ridge Beam and the 
side of the sheet over hangs the end of the Ridge Beam and 
the Top Plate by 15mm. 

 

 

Ensure the Ridge Beam and the Top Plate are straight. 

 

 

Nail 4 x corners of the Roof Sheet as shown, ensuring the 
ribs on the Roof Sheet line up with the front Roof Sheet and 
the back Wall Sheet. Nail off the first sheet. 

SIDE

 

WALL

 

FRONT WALL

 

BACK WALL

 

SIDE

 

WALL

 

TOP PLATE 

BOTTOM PLATE 

fig.2 

X 4 

X 4 

Barge

 

STEP 5: 

 

 

Rivet the 2 ridge flashings together using 4 rivets, 
so total flashing is 3.050m long. Rivet the Ridge 
Flashing to the centre of the roof using 8 x rivets 
as shown (

fig.1

). 

STEP 7: 

 

 

Place spouting in position and rivet to Barge Flashings at 
each end and rivet to roof sheets (1 rivet per 1 sheet). 
Repeat with remaining spouting. 

Summary of Contents for SS3025

Page 1: ...ASSEMBLY INSTRUCTIONS SS3025 BASE SIZE 3 020m x 2 520m...

Page 2: ......

Page 3: ...cladding used in Smart Store Sheds Wash all surfaces annually using a hose and soft nylon brush Within 2 km of coast wash every 3 months as above After a storm wash the cladding and the gutters as so...

Page 4: ...m 2 Roof 1 350 m 12 Weatherstrip 1 810 m 1 Door 3 4 Sheet 1 810 m 3 Barge 1 350 m 4 TIMBER Ridge Flashing 1 800 m 2 Bottom Plates H4 Green Front Back 3 020 m 2 Padbolt Support Front 0 140 m 1 Bottom...

Page 5: ...de Back Wall Sheets Front Wall Sheets Door Jambs Front Wall Sheet Door Side Flashing Hinge Door Brace Door Top Bottom Channel Ridge Beam Jack Stud Ridge Flashings x 2 5 ASSEMBLE FRONT PANEL 6 ASSEMBLE...

Page 6: ...coming through from underneath During construction you may raise the bottom timber plate to allow the wall cladding to protrude 20mm below the bottom plate This will stop water flowing between the bot...

Page 7: ...or as shown Drill and rivet as per dia gram ensuring rivets penetrate into door sheet STEP 4 Rivet door brace flashings onto back of door as shown Where possible rivet from front of door Ensure the do...

Page 8: ...n STEP 3 Nail wall sheets to the Top Plate at each end making sure that the top corners of the sheets are flush with the top of the Top Plate and that the sides of the wall sheet overhang the Top Plat...

Page 9: ...ate using two clouts per pan STEP 4 Nail the wall sheets to the Bottom Plate at each end ensuring that each side of the wall sheets overhangs the Bottom Plate by 15mm and that the distance between the...

Page 10: ...ing Ensure the doors close properly then fit remaining rivets STEP 3 Place 3 x Wall Sheets on timber plates and rivet the sheets together as shown Ensure that the top of the sheet is flush with the to...

Page 11: ...g someone to support the panels while they are screwed together Before fixing ensure that the Side Panel overlaps the Back Panel Using 4 x 40mm screws 2 per join screw the Top and Bottom Plates togeth...

Page 12: ...heck that the shed is sitting level and square and that the diagonal Top Plate measurements are the same fig 1 JACK STUD TOP PLATE RIDGE BEAM fig 2 fig 3 15mm JACK STUD RIDGE BEAM TOP PLATE ROOF SHEET...

Page 13: ...PLATE STEP 3 Position 1 x roof sheet slotted end facing back so that the top of the sheet is at the centre of the Ridge Beam and the side of the sheet over hangs the end of the Ridge Beam and the Top...

Page 14: ...ENTRY FLOOR Position the Floor Joists centrally between the side Base Plates and skew nail each end with two 75mm nails Check that the shed is sitting level and square and that the diagonal Bottom Pla...

Page 15: ......

Page 16: ...s less than 200g m2 as published by Branz Warranty certificate being returned to manufacturer within 21 days of purchase together with proof of purchase This warranty does not cover the following Fast...

Reviews: