background image

 

 

SS1515 PARTS LIST 

DESCRIPTION 

QTY 

DIAGRAM 

 

DESCRIPTION 

QTY 

DIAGRAM 

 

CLADDING 

FLASHINGS 

Front Wall 

1.890 m 

 

 

Door Side 

1.850 m 

 

 

Back Wall 

1.850 m 

 

 

Door Jamb 

1.890 m 

 

 

Side Wall 

1.850 m 

 

 

Corner Door Jamb 

1.890 m 

 

 

Roof 

1.720 m 

 

 

Door Brace 

1.255 m 

 

 

Door 3/4 Sheet 

1.850 m 

 

 

Barge 

1.720 m 

 

 

TIMBER 

Padbolt Support 

0.140 m 

 

 

Bottom Plates - H4

(Green) 

Front/Back           

1.520 m 

 

 

Spouting 

1.550 m 

 

 

Bottom Plates - H4

(Green) 

Sides 

1.520 m 

 

 

 

 

 

 

Top Plate - H1 (Red) 

Front                   

1.520 m 

 

 

HARDWARE 

 

Top Plate - H1 (Red) 

Back                    

1.520 m 

 

 

Hardware Pack 

 

 

Top Plate - H1 (Red) 

Sides                   

1.520 m 

 

 

Paint & Brush 

 

 

CHANNELS 

 

 

 

 

Door Top/Bottom 

0.945 m 

 

 

OPTIONAL

 

 

 

 

 

Bolt Down Kit 

 

 

 

 

 

 

DATE: 
 
PACKED BY: 

 

 

 

 

CHECKED 

CHECKED 

Summary of Contents for SS1515

Page 1: ...ASSEMBLY INSTRUCTIONS SS1515 BASE SIZE 1 520m x 1 520m...

Page 2: ......

Page 3: ...r cladding used in Smart Store Sheds Wash all surfaces annually using a hose and soft nylon brush Within 2 km of coast wash every 3 months as above After a storm wash the cladding and the gutters as s...

Page 4: ...3 Door Brace 1 255 m 2 Door 3 4 Sheet 1 850 m 2 Barge 1 720 m 2 TIMBER Padbolt Support 0 140 m 1 Bottom Plates H4 Green Front Back 1 520 m 2 Spouting 1 550 m 1 Bottom Plates H4 Green Sides 1 520 m 2...

Page 5: ...ont Bottom Plate Side Back Wall Sheets Front Wall Sheet Door Jambs Door Sheets Door Side Flashings Padbolt Support Flashing Hinge Door Brace Door Top Bottom Channel QUICK OVERVIEW 1 LAY FOUNDATION 2 A...

Page 6: ...coming through from underneath During construction you may raise the bottom timber plate to allow the wall cladding to protrude 20mm below the bottom plate This will stop water flowing between the bot...

Page 7: ...fig 1 Rivet sheets together STEP 2 Position door side flash ings and assemble door as shown Drill and rivet as per dia gram ensuring rivets penetrate into door sheet STEP 4 Rivet door brace flashings...

Page 8: ...ing each side of wall sheets overhangs the end of Bottom Plate by 15mm Check that the distance between the Top and Bottom Plates is correct As per diagram in step 1 Check that the Bottom Plate is stra...

Page 9: ...e wall sheets overhang the Top Plate by 15mm as shown Check that the Top Plate is straight then nail wall sheets to the Top Plate using two clouts per pan STEP 4 Nail the wall sheets to the Bottom Pla...

Page 10: ...properly then fit remaining rivets STEP 3 Place 1 x Wall Sheet on timber plates and rivet the sheets together as shown Ensure that the top of the sheet is flush with the top of the Top Plate and that...

Page 11: ...s while they are screwed together Before fixing ensure that the Side Panel overlaps the Back Panel Using 4 x 40mm screws 2 per join screw the Top and Bottom Plates together in the corners STEP 2 Repea...

Page 12: ...s to the front back Top Plates using 1 x nail per pan fig 2 STEP 4 Place barge flashings on roof at end of shed ensuring the diagonal trimmed end is at the front Rivet the Barge Flashings to the roof...

Page 13: ...to the Bottom Plate and the concrete slab A 10mm masonry drill bit is required OPTIONAL SENTRY FLOOR Position the Floor Joists equally between the side Base Plates and skew nail each end with two 75mm...

Page 14: ......

Page 15: ...s less than 200g m2 as published by Branz Warranty certificate being returned to manufacturer within 21 days of purchase together with proof of purchase This warranty does not cover the following Fast...

Reviews: