background image

 

 

BOTTOM PLATE 

TOP PLATE 

TOP PLATE 

1834mm 

BOTTOM PLATE 

1834mm 

TOP PLATE 

15mm 

15mm 

BOTTOM PLATE 

15mm 

15mm 

1834mm 

1834mm 

TOP PLATE 

SELECT: 

 

3 x 1.890m Wall Sheets 

1 x 1.520 m Top Plate (Red) 

1 x 1.520 m Bottom Plate (Green) 

36 x 30mm Galv Clouts 

4 x Rivets 

STEP 1: 

 

 

Lay out 1 x Top Plate and 1 x Bottom Plate on a 
flat surface as shown (corner cutouts to face in-
wards).  

STEP 2: 

 

 

Place 3 x 1.890 m wall sheets on top of timber 
Plates with bottom of sheets flush with each oth-
er.  

 

 

Rivet the sheets together on overlaps as shown

.

 

STEP 3: 

 

 

Nail the wall sheets to the Top Plate at each end making sure 
that the top of the sheets are flush with the top of the Top 
Plate and that the sides of the wall sheets overhang the Top 
Plate by 

15mm

 as shown. 

 

 

Check that the Top Plate is straight then nail wall sheets to 
the Top Plate, using two clouts per pan.  

STEP 4: 

 

 

Nail the wall sheets to the Bottom Plate at each end,  

     ensuring that each side of the wall sheets overhangs the                           

Bottom Plate by 

15mm

 and that the distance between  

     the Top and Bottom Plates is correct. (As shown) 
 

 

Check that the Bottom Plate is straight then nail   

     wall sheets to the Bottom Plate, using two clouts per pan

.

 

Std Shed —

 

Bottom Plate will protrude below wall sheet by 

approximately 10mm.  
 
Raised base plate shed —

 

Wall sheet will protrude below 

the Bottom Plate by 20mm

ASSEMBLE BACK PANEL 

IMPORTANT—IF YOU CHOOSE TO RAISE YOUR TIMBER 

BASE PLATE –READ THE FOLLOWING; 

 

For sheds with Raised Base Plate option only (see page 5), deduct 

30mm from measurement shown between Top and Bottom Plates on 
all wall panels, so cladding protrudes 20mm below bottom plate

Summary of Contents for SS1510

Page 1: ...ASSEMBLY INSTRUCTIONS SS1510 BASE SIZE 1 520m x 1 020m...

Page 2: ......

Page 3: ...r cladding used in Smart Store Sheds Wash all surfaces annually using a hose and soft nylon brush Within 2 km of coast wash every 3 months as above After a storm wash the cladding and the gutters as s...

Page 4: ...255 m 2 Door 3 4 Sheet 1 810 m 2 Barge 1 110 m 2 TIMBER Ridge Flashing 1 550 m 1 Bottom Plates H4 Green Front Back 1 520 m 2 Padbolt Support 0 140 m 1 Bottom Plates H4 Green Sides 1 020 m 2 Spouting...

Page 5: ...nt Bottom Plate Side Back Wall Sheets 3 Sheets Front Wall Sheet Door Jambs Door Sheets Door Side Chan Padbolt Support Hinge Door Brace Door Top Bottom Channel QUICK OVERVIEW 1 LAY FOUNDATION 2 ASSEMBL...

Page 6: ...coming through from underneath During construction you may raise the bottom timber plate to allow the wall cladding to protrude 20mm below the bottom plate This will stop water flowing between the bot...

Page 7: ...Rivet sheets together STEP 2 Position door side flash ings and assemble door as shown Drill and rivet as per dia gram ensuring rivets penetrate into door sheet STEP 4 Rivet door brace flashings onto b...

Page 8: ...then nail along the wall sheet to the Top Plate two clouts per pan see fig 1 STEP 4 Nail the wall sheets to the Bottom Plate at each end ensuring each side of wall sheets overhangs the end of Bottom...

Page 9: ...ng the Top Plate by 15mm as shown Check that the Top Plate is straight then nail wall sheets to the Top Plate using two clouts per pan STEP 4 Nail the wall sheets to the Bottom Plate at each end ensur...

Page 10: ...mm below top plate Using two rivets rivet the top and bottom hinges to the Door Jamb Flashing Ensure the door closes properly then fit remaining rivets STEP 3 Place 1 x Wall Sheet on timber plates Ens...

Page 11: ...ey are screwed together Before fixing ensure that the Side Panel overlaps the Back Panel Using 4 x 75mm screws screw the Top Plates together Using 4 x 40mm screws screw the Bot tom Plates together STE...

Page 12: ...e roof sheets to the front back Top Plates using 1 x nail per pan fig 3 IMPORTANT FOR SHEDS WITH OPTIONAL CLEAR ROOF PANEL Assemble as below making sure that the Clear Roof Sheets overlap the standard...

Page 13: ...x to the Bottom Plate and the concrete slab A 10mm masonry drill bit is required OPTIONAL SENTRY FLOOR Position the Floor Joists centrally between the side Base Plates and skew nail each end with two...

Page 14: ......

Page 15: ...s less than 200g m2 as published by Branz Warranty certificate being returned to manufacturer within 21 days of purchase together with proof of purchase This warranty does not cover the following Fast...

Reviews: