Riverlea Group Ltd warrant that the cladding used in the manufacture of the Smart Store shed will not rust within 15 years from the 

date of purchase.

 

 

 

Any liability for product failure that may arise will be limited to repair or replacement of the defective product and will only apply for 

the benefit of the original purchaser. Riverlea Group Limited will not be liable for any consequential loss or damage, labour, or 

transport charges.

 

 

 

This warranty is conditional on:

 

 

Construction, installation and maintenance being carried out as specified in the Assembly Instruction Manual.

 

 

The shed being installed in modest inland corrosion zones or areas where the steel corrosion rate is less than 200g/m2          
(as published by Branz).

 

 

Warranty certificate being returned to manufacturer within 21 days of purchase together with proof of purchase. 

 

 

 

This warranty does not cover the following:

 

 

Fastenings and fixings.

 

 

Normal wear and tear, damage by impact or acts of God.

 

 

Situations where the shed has been used for storage of chemicals, manure or corrosion causing products.

 

 

Unauthorized modification of the structure, including painting of the cladding.

 

 

Please visit http://www.riverleagroup.co.nz/warranty

-

garden

-

sheds to validate the Warranty on your shed.

 

Click on the Warranty Registration Link and complete all details.

 

 

If you are unable to access the computer, please phone us on 0800 438 274 and one of the customer services team 

will help you to activate the warranty on your garden shed. 

 

 

 

Many thanks, from the Team at Riverlea Group. 

15 YEAR WARRANTY

 

WARRANTY REGISTRATION

 

Summary of Contents for SS1510

Page 1: ...ASSEMBLY INSTRUCTIONS SS1510 BASE SIZE 1 520m x 1 020m...

Page 2: ......

Page 3: ...r cladding used in Smart Store Sheds Wash all surfaces annually using a hose and soft nylon brush Within 2 km of coast wash every 3 months as above After a storm wash the cladding and the gutters as s...

Page 4: ...255 m 2 Door 3 4 Sheet 1 810 m 2 Barge 1 110 m 2 TIMBER Ridge Flashing 1 550 m 1 Bottom Plates H4 Green Front Back 1 520 m 2 Padbolt Support 0 140 m 1 Bottom Plates H4 Green Sides 1 020 m 2 Spouting...

Page 5: ...nt Bottom Plate Side Back Wall Sheets 3 Sheets Front Wall Sheet Door Jambs Door Sheets Door Side Chan Padbolt Support Hinge Door Brace Door Top Bottom Channel QUICK OVERVIEW 1 LAY FOUNDATION 2 ASSEMBL...

Page 6: ...coming through from underneath During construction you may raise the bottom timber plate to allow the wall cladding to protrude 20mm below the bottom plate This will stop water flowing between the bot...

Page 7: ...Rivet sheets together STEP 2 Position door side flash ings and assemble door as shown Drill and rivet as per dia gram ensuring rivets penetrate into door sheet STEP 4 Rivet door brace flashings onto b...

Page 8: ...then nail along the wall sheet to the Top Plate two clouts per pan see fig 1 STEP 4 Nail the wall sheets to the Bottom Plate at each end ensuring each side of wall sheets overhangs the end of Bottom...

Page 9: ...ng the Top Plate by 15mm as shown Check that the Top Plate is straight then nail wall sheets to the Top Plate using two clouts per pan STEP 4 Nail the wall sheets to the Bottom Plate at each end ensur...

Page 10: ...mm below top plate Using two rivets rivet the top and bottom hinges to the Door Jamb Flashing Ensure the door closes properly then fit remaining rivets STEP 3 Place 1 x Wall Sheet on timber plates Ens...

Page 11: ...ey are screwed together Before fixing ensure that the Side Panel overlaps the Back Panel Using 4 x 75mm screws screw the Top Plates together Using 4 x 40mm screws screw the Bot tom Plates together STE...

Page 12: ...e roof sheets to the front back Top Plates using 1 x nail per pan fig 3 IMPORTANT FOR SHEDS WITH OPTIONAL CLEAR ROOF PANEL Assemble as below making sure that the Clear Roof Sheets overlap the standard...

Page 13: ...x to the Bottom Plate and the concrete slab A 10mm masonry drill bit is required OPTIONAL SENTRY FLOOR Position the Floor Joists centrally between the side Base Plates and skew nail each end with two...

Page 14: ......

Page 15: ...s less than 200g m2 as published by Branz Warranty certificate being returned to manufacturer within 21 days of purchase together with proof of purchase This warranty does not cover the following Fast...

Reviews: